Summary
Overview
Work history
Education
Skills
References
Timeline
Generic

Gary Leech

Goxhill,Lincolnshire

Summary

Experienced construction professional with extensive expertise in building regulations, scaffold setup, and bricklaying. Demonstrates strong competency in framing techniques, foundation setting, and plumbing installation, ensuring site safety and compliance with health and safety standards. Skilled in risk assessment, quality control, and project scheduling, with a proven track record in worksite management and client relations. Adept at blueprint reading and interpretation, construction processes, and cost estimation. Committed to delivering high-quality results through effective teamwork and decision-making.

Overview

44
44
years of professional experience
4
4
years of post-secondary education

Work history

Self employed builder

Self employed
Goxhill, Lincolnshire
08.1985 - Current
  • Coordinated construction projects from inception to completion for seamless execution.
  • Led teams of skilled tradespeople to meet project deadlines.
  • Ensured customer satisfaction by delivering projects on time and within budget.
  • Poured concrete foundations, key step in building process.
  • Maintained cleanliness on construction sites, promoting a safe work environment.
  • Constructed residential homes, ensuring quality workmanship at all times.
  • Built strong relationships with subcontractors to ensure smooth project completion.
  • Performed roofing installations, major element in new builds or renovations.
  • Managed supply orders for efficient use of materials, reducing waste.
  • Interpreted technical drawings accurately resulting in flawless project implementation.
  • Provided expert masonry work, enhancing property aesthetics and value.
  • Installed windows and doors with precision for optimal home insulation.
  • Utilised power tools proficiently whilst maintaining strict safety protocols.
  • Adhered to local building regulations throughout all phases of construction ensuring legal compliance.
  • Conducted thorough site inspections to maintain regulatory compliance.
  • Looked after tools, materials and equipment, making available for use when required.
  • Carried out work at heights using ladders, scaffolding and worked in confined spaces, following all safety procedures.
  • Established long-lasting relationships with clients based upon reliability, quality and professionalism.
  • Assessed building plans, requesting parts and materials required to complete work.

Builder

Trinity Builders
Barton upon Humber, North Lincolnshire
03.1984 - 08.1985
  • Prepared wall surfaces for plastering to ensure durability.
  • Improved workflow efficiency by implementing strategic plastering schedules.
  • Prepared surfaces for plastering, ensuring optimal adhesion.
  • Performed groundworks including concreting, drainage installation; ensured solid base for structures.
  • Prepared sites and surfaces for concreting.
  • Carried out day-to-day duties accurately and efficiently.
  • Quickly learned and applied new skills to daily tasks, improving efficiency and productivity.
  • Successfully delivered on tasks within tight deadlines.
  • Supported team by demonstrating respect and willingness to help.
  • Worked flexible hours, covering nights, weekends and bank holidays.
  • Measured and marked out materials with accuracy for precise cuts and joints.
  • Provided guidance on material selection leading to cost-effective solutions for clients.
  • Upheld company standards by consistently delivering quality services.

Apprentice builder

Ken Leech
Goxhill, Barrow-upon-Humber, North Lincolnshire
10.1981 - 03.1984
  • Developed practical skills for enhanced productivity through hands-on training.
  • Undertook additional responsibilities willingly, displaying commitment towards job role.
  • Demonstrated strong attention to detail whilst carrying out complex assignments.
  • Maintained clean and safe working environment, enhancing overall efficiency.
  • Assisted senior staff members for better project execution.
  • Strengthened understanding of business operations by actively listening during briefings and trainings.
  • Utilised technical knowledge for problem-solving during challenging situations.
  • Commended for punctuality and consistent regular attendance.
  • Observed safety protocols consistently, ensuring a risk-free workplace.
  • Helped to prepare and execute projects under supervision.
  • Attended necessary training and completed assessments.
  • Completed related coursework on time and to high standard.
  • Adapted quickly to changing work requirements, maintaining high-performance standards under pressure.

Education

NVQ Level 2 - Building

North Lindsey College
Scunthorpe
09.1980 - 07.1984

Skills

  • Building regulations knowledge
  • Scaffold setup
  • Bricklaying competency
  • Framing techniques
  • Foundation setting
  • Plumbing installation
  • Site safety awareness
  • Risk assessment competence
  • Quality control understanding
  • Foundations laying
  • Plastering techniques
  • Material ordering
  • Earthwork excavation
  • Health and Safety Compliance
  • Team player
  • Multidisciplinary teamwork
  • Project scheduling
  • Blueprint reading
  • Building tool and equipment maintenance
  • Blueprint interpretation
  • Construction processes
  • Worksite management
  • Hand and power tools operation
  • Client relations
  • Concrete finishing
  • Groundworks and drainage
  • Rendering
  • Extensions and conversions
  • Building repair and maintenance
  • Roof construction
  • Construction cost estimates
  • Bricklaying
  • Decision making

References

References available upon request.

Timeline

Self employed builder

Self employed
08.1985 - Current

Builder

Trinity Builders
03.1984 - 08.1985

Apprentice builder

Ken Leech
10.1981 - 03.1984

NVQ Level 2 - Building

North Lindsey College
09.1980 - 07.1984
Gary Leech