Summary
Overview
Work history
Education
Skills
Professional training
Timeline
Generic
Gary Benford

Gary Benford

Summary

Experienced oil and gas professional. Career progression through Senior Drilling Engineer, Drilling Superintendent and Drilling/Well Engineering Manager with a total of 36 years of diverse international, exploration, development and project management experience. Wide ranging career with a proven project delivery track record in drilling operations and well engineering design/construction through cross-functional expertise in drilling, completions, facilities, production operations, finance and HSE. Well versed in onshore and offshore operations including brownfield re-developments, abandonment and decommissioning.

Overview

38
38
years of professional experience

Work history

Drilling Superintendent

Basra Energy Company Ltd
Basra, Iraq
2023.04 - Current
  • Drilling Superintendent, Rumaila Operating Organisation, Rumaila Oilfield, southern Iraq
  • Drilling operations and safety management of ROO’s turnkey Drilling Contractors
  • Operations management of 6 turnkey drilling rigs delivering 45 wells per year
  • Drive drilling operational safety performance through the contractor management team and rig site personnel
  • Conduct incident investigations and ensure close out of actions and implementation of Lessons Learnt
  • Ensure contractor compliance with ROO Drilling standards & Safety standards
  • Improve Contractor SOP’s and standards to optimise ROO’s turnkey well construction process.

Drilling and Well Engineering Manager

Dagang Zhaodong Oil Company of PetroChina
Tianjin, Peoples Republic of China
2015.04 - 2021.01
  • Management team position - management of well engineering design, well construction and drilling operations for Zhaodong field, offshore Bohai Bay, PRC during and after transfer of Operatorship to PetroChina
  • Established Operatorship transfer process for well engineering design and drilling operations management (handover planning and execution).
  • Coaching and mentoring of new PetroChina senior management team
  • Advanced safety management to achieve 3 years without LTI

Drilling and Well Engineering Manager

Roc Oil (Bohai) Company
Beijing, Peoples Republic of China
2010.12 - 2015.03
  • Management of well engineering design, well construction and offshore drilling operations for Zhaodong field (20 wells per annum, high risk, complex anti-collision management)
  • Complex field with 60 discrete reservoirs requiring sand control and artificial lift, 315 well development drilling programme, 6 platforms
  • $130 MM annual drilling capital budget preparation and management
  • Continuously improved operational safety record to achieve 5 years without LTI
  • Management of PetroChina drilling contractor, rig equipment maintenance planning and verification audits
  • Recruitment, development and management of 30 departmental staff
  • Set minimum operational performance standards and procedures
  • Monitor drilling performance and produce benchmarking metrics. Consistently performed in top quartile within peer group.
  • Development of Company's Asset Integrity Management and Well Engineering Management System
  • Management and supervision of 35 separate contracts and tender processes with 3rd party service providers.

Drilling Superintendent

Regal Petroleum Ltd
Kiev, Ukraine
2008.08 - 2010.11
  • Management of well design and construction of 70 well development plan in Ukraine
  • Prepared $250 MM budget for onshore gas field to drill deep, tight gas condensate wells to 6,200m TVD
  • Well design review and implementation of multi-rig programme with limited infrastructure
  • Rig contractor auditing (SMS and PMS)
  • Training and mentoring of 20 local Ukrainian staff
  • Established management and supervision of all contractor tender processes, programmes and budgets.

Drilling Superintendent

TNK-BP/RUSIA Petroleum JSC
Moscow & Irkutsk, Russia
2005.01 - 2008.07
  • Project management team drilling ERD development wells in Kovykta gas condensate field, onshore eastern Siberia
  • Management of well engineering design and drilling operations
  • Specify permanent well and rig equipment (tendering process)
  • Development of national Russian rig contractor relationships to improve operational efficiency and safety management
  • Prepared $100 MM budget to drill first 6 horizontal wells using upgraded Russian drilling rigs
  • Team coordinator for TNK-BP RUSIA Petroleum joint venture
  • Prepare budgets/AFE's, manage and coordinate 3rd party service contractors
  • Training and mentoring of local Russian staff.

Drilling Superintendent

UzPEC Ltd
Tashkent, Uzbekistan
2003.01 - 2005.01
  • Management of onshore drilling, completions and workover operations for horizontal sour oil and gas wells in fractured carbonate reservoirs. Reduced operational costs by 25%.
  • Management of Chinese drilling contractor, well site construction and remote drilling operations
  • Rig equipment auditing and upgrades
  • Blow out contingency planning and preparation.

Senior Drilling Engineer/Drilling Supervisor

Burlington Resources Ltd
Hassi Messaoud, Algeria
2002.06 - 2002.12
  • Performed well design and construction for 6 land exploration and development wells in Block 402 and 405.

Senior Drilling Engineer

Premier - Kufpec Pakistan BV
Islamabad, Pakistan
2002.01 - 2002.05
  • Prepared well engineering designs and drilling programmes for land exploration gas project
  • Reduced well costs by 15%

Senior Drilling Engineer

Salyan Oil Ltd
Baku, Azerbaijan
2000.01 - 2001.12
  • Well engineering design for deep/high pressure exploration/development wells on shore Azerbaijan
  • Prepared $50MM drilling budget and AFE's
  • Improved efficiency of field operations by establishing and implementing SOP's
  • Planned supervision of coiled tubing operations in high pressure development wells
  • Designed slim-hole single and multi-lateral re-entries from existing old well bores

Senior Drilling Engineer

Premier Exploration Pakistan Ltd
Islamabad, Pakistan
1999.07 - 1999.12
  • Well design/construction of land exploration/appraisal gas wells in fractured carbonates
  • Optimised remote area operations, well site construction and logistics management.
  • Drove continuous efficiency and cost improvements, developing well designs that resulted in $500K cost saving per well.

Drilling Supervisor

Premier Petroleum Myanmar Limited
Offshore, Myanmar
1998.01 - 1999.06
  • Executed $300 MM budget for development of Yetagun gas field
  • Initiated development drilling programme and rig mobilisation
  • Offshore supervision/construction of 8 ERD development wells.

Senior Drilling Engineer

British Gas plc
Islamabad, Pakistan
1997.01 - 1997.12
  • Land exploration drilling in Baluchistan Province
  • Prepared well designs and drilling programmes for wildcat gas wells
  • Successfully reduced exploration drilling costs by 50%.

Operations Drilling Engineer

Premier Exploration Pakistan Ltd
Islamabad, Pakistan
1996.04 - 1996.12
  • Well design and operations support for land exploration wells in Sindh Province
  • Drilling programme preparation, well testing operations and contractor management.

Drilling Engineer

Conoco (UK) Ltd
Aberdeen, UK
1990.04 - 1996.04
  • Various assignments working on fields in UKNS
  • Designed first horizontal wells drilled in Carboniferous formation of SNS for Murdoch gas field.

Mining Engineer

General Mining Union Corporation (Gencor) Ltd
Welkom, RSA
1988.01 - 1988.12
  • Hard rock gold mining, Beatrix Gold Mine, Orange Free State, RSA.

Education

Master of Engineering - Petroleum Engineering

Heriot Watt University
Edinburgh
1990

Bachelor of Engineering - Mining Engineering

Camborne School of Mines
Camborne
1989

Skills

  • Leadership
  • Strong communicator across all levels
  • Drilling operations management (land and offshore)
  • Rig contractor management
  • Rig equipment auditing and maintenance planning
  • Well engineering management
  • Well design and construction (Well Engineering Management systems and equipment selection)
  • Completion design
  • Project management
  • High-value Budget preparation and management
  • HSE management systems
  • Process Safety and risk assessment
  • Contractor management and tendering processes
  • Problem solver
  • Attention to detail

Professional training

A wide array of management courses and technical training for offshore and land drilling operations, well design, completions, workovers, wireline operations, artificial lift, sand control, well testing, directional/horizontal drilling, well control, process safety, HSE management systems, risk analysis.

Timeline

Drilling Superintendent

Basra Energy Company Ltd
2023.04 - Current

Drilling and Well Engineering Manager

Dagang Zhaodong Oil Company of PetroChina
2015.04 - 2021.01

Drilling and Well Engineering Manager

Roc Oil (Bohai) Company
2010.12 - 2015.03

Drilling Superintendent

Regal Petroleum Ltd
2008.08 - 2010.11

Drilling Superintendent

TNK-BP/RUSIA Petroleum JSC
2005.01 - 2008.07

Drilling Superintendent

UzPEC Ltd
2003.01 - 2005.01

Senior Drilling Engineer/Drilling Supervisor

Burlington Resources Ltd
2002.06 - 2002.12

Senior Drilling Engineer

Premier - Kufpec Pakistan BV
2002.01 - 2002.05

Senior Drilling Engineer

Salyan Oil Ltd
2000.01 - 2001.12

Senior Drilling Engineer

Premier Exploration Pakistan Ltd
1999.07 - 1999.12

Drilling Supervisor

Premier Petroleum Myanmar Limited
1998.01 - 1999.06

Senior Drilling Engineer

British Gas plc
1997.01 - 1997.12

Operations Drilling Engineer

Premier Exploration Pakistan Ltd
1996.04 - 1996.12

Drilling Engineer

Conoco (UK) Ltd
1990.04 - 1996.04

Mining Engineer

General Mining Union Corporation (Gencor) Ltd
1988.01 - 1988.12

Master of Engineering - Petroleum Engineering

Heriot Watt University

Bachelor of Engineering - Mining Engineering

Camborne School of Mines
Gary Benford