Construction professional with valuable experience of large corporate construction sites, as well as residential projects
Overview
11
11
years of professional experience
Work History
Resident Site Engineer
D A CANT
Frinton-on-Sea, Essex
09.2022 - Current
Coordinate contractors, subcontractors and labourers to deliver on projects.
Monitor and maintained health and safety standards for site compliance.
Prevent project delays through carefully considered risk and feasibility assessments.
General site setting out of roads profile, drainages, plot footings / foundations, kerbs.
establishing control datum's and giving levels to all subcontractors.
Checking and monitoring of all works on site.
QA checks
Doing take of, of materials needed on site
Booking in for CBRs and NUCLEAUR DENSITY TEST on pipe lines and road formations
Sending off granular samples for testing
As-built surveys
setting out of road and yard gullies
Setting out 278 works
Senior Site Engineer
MDS CIVIL ENGINEERING
ESSEX, Essex
02.2022 - 06.2022
Achieved high levels of client satisfaction by leading and proactively contributing to project progress meetings.
Ensured quality construction by completing quality documentation and managing as-built record information.
Maintained site efficiencies by administering equipment servicing, promptly reporting malfunctions.
Motivated teams to deadline through regular site visits and inspections, problem-solving accordingly and eliminating bottlenecks.
Establishing datums and controls across site
Giving line and levels to subcontractors
Setting out footings of buildings
General setting out on site.
Site Civil Engineer
HENNIGAN BUILDING /CIVIL ENGINEERING LTD
Felixstowe, Suffolk
10.2020 - 01.2022
Ensured construction detail documentation conformed to quality assurance and best practice standards.
Advised managerial staff about design, construction and project modifications.
Resolved level problems by collecting data, establishing facts and drawing accurate conclusions.
Calculated volume take-off and cost estimates for landscape.
Identified and resolved potential structural issues.
Setting out of pond to hold water over 100 years in case of flood.
Setting out of deep drainage
Setting out of holding down bolts
Interpretation of architectural drawings to ground workers
Setting out of services
Giving accurate levels on site
Establishing control stations around site
Setting out of sprinkler base tanks, substations, bicycle shelter
Setting out of gatehouse and position for barrier gate and sliding gate
Setting out roads and car park
Setting out trief kerbs, HB2 kerbs, CS2 kerbs, BN2 kerbs
Setting out high compressive cellular attenuation tank
Setting out hydro brake manhole
Setting out gatic/linear drainage around dock levels
Setting out foul and storm drainage
Setting out pup ups
Setting out footings for steel erections and retaining wall
Line and levelling steel
Filling of QA sheet
Doing as built of works done
Raising RFI
Setting out of wind wall base
Setting out per the drawings provided
Site Engineer
MARBANK CONSTRUCTION
RAINHAM ,EAST LONDON, ESSEX
04.2019 - 09.2020
Setting out linear drainage, patrol interceptors, attenuation tank, hydrobrakes and downstream defender
Setting out of storm and foul drainages with accurate invert levels
Giving the cut and fill levels
Responded to technical concerns quickly and effectively devised solutions.
Surveyed, graded and levelled construction sites.
Monitored team of personnel during construction activities for compliance with health and safety requirements.
Oversaw quality control and health and safety matters for construction teams.
Surveyed site, marked locations and oversaw construction of roads and other infrastructure components.
Reviewed engineering specifications, scopes of work to suit on site construction
Setting out of roads, kerbs and edging
QA checks
Line and levelling of steel
Setting out templet for steel bases
Setting out of weigh bridges
Interpreting of engineering and architectural drawings
Providing of weekly as built in PDF and AUTOCAD
SITE ENGINEER
DARBY GROUNDWORKS
HORN CHURCH, ESSEX
01.2019 - 04.2019
Briefing the working party and managing on site activities
Ensuring works are being carried out in a safe manner
Surveying of line levels on foundations and excavation
Conduction of take offs
Completing quality control documents of works
Raising RFI
Producing final as built of works
Setting out of civil engineering scope of works such as earthworks,drainage,structures etc
Operate and promote high standard of health and safety and environmental compliance
General setting out such as ,ECO TANK,BUILDING FOOTINGS,STORM DRAINS,MANHOLES,KERBS,GULLIES,SERVICES,ROADS ETC
Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.
SITE ENGINEER
OSBONE CONSTRUCTION
LITTLE BENTLY, ESSEX
02.2018 - 11.2018
Acted as a technical adviser for subcontractors,craftsmen and operatives
Checked plans, drawings and quantities for accuracy of calculations
Ensured that all materials used and work performed were in accordance with the work specifications
Checking base stations and site control prior to commencement of works and at regular intervals
Request appropriate information from client representatives via RFI
Communicate setting out control to site operatives clearly
Record dimensions of hard breakout,soft spot,calculate volumes etc as directed by the QS
Supersede drawings as new ones are being issued
Setting out road channels with profile boards and traveller
Setting out of batter rails
Setting out radius kerbs
Setting out of services and drainage
Taking of as built
SITE ENGINEER
NRI
LETCHWORTH, WEST MIDLANDS
01.2017 - 01.2018
Established an effective system to record works completed and updating the project quality plan accordingly by filing out a QA sheet.
Regularly checking the setting out points and benchmarks and checking that all setting out instruments and measuring equipment are delivered to site with a calibration certificate and recorded accordingly
Providing and maintaining setting out and dimensional control, to ensure accurate construction of the work
Ensuring high personal safety and environmental standards are upheld
Communicate with personnel to ensure full understanding of information provided
Ensure that the drawings and specification documents contain sufficient, accurate information
General setting out including footing and pad foundation,radius kerbs,drainage,services
Marking out bolt for steel frames
Road setting out with profile boards and traveller
Setting out of retaining walls
Producing as built
SITE ENGINEER
MACDERMOTTS GROUND WORKS
BIGGLESWADE, MIDLANDS
12.2015 - 11.2016
Ensured that the drawings and specification documents contain sufficient, accurate information.
Communicated with personnel to ensure full understanding of information provided per setting out provided
Ensured high personal safety and environmental standards are upheld
General setting out such as bollards position,kerbs,land scarping by DTM,utilities,drainage,manholes etc
Working to tight tolerances
Produce of as built
SITE ENGINEER
GALDRIS GROUND WORKS
SHOEBURYNESS
08.2015 - 12.2015
Setting out and monitoring of works on site
Ensure quality control requirements are met and recorded in accordance with specification
Operate and promote a high standard of health and safety and environment compliance
Raising of technical queries
Measuring & 'Taking-Off’ quantities from drawings
Road setting out
Setting out of steel on foundation footings
Setting out of levels on laser
Setting out of deep drainage, services and utilities
Setting out of kerbs
SITE ENGINEER
J REDDINGTON LTD
WHITE GARDENS, LONDON
03.2014 - 08.2015
Setting out of columns,drainage pipes,hilti colours,slab edge,alfins,RC frame erections
establishing of datum on each level as the building rise
As built survey
Signing off QA sheet
Plumbing of shatters for pre pours and in situ columns
Ensuring health and safety is been adhered to accordingly
Slip form
SITE ENGINER
MAL LTD
LONDON, LONDON
02.2014 - 03.2014
Establishing of height datum from existing external benchmark onto the working site with tight tolerance
Monitoring and checking of all existing control stations
setting out cladding and curtain walling,steel work,form-work and dry-walling
As built survey of constructed structures
Liaising with subcontractors
ensuring good health and safety practice on site
3d scanning
ASSISTANT SITE ENGINEER
LAGAN CONSTRUCTION
LONDON, CITY AIRPORT
01.2013 - 01.2014
Stacking out of existing electrical pits
Laising with subcontractors
ensuring that health and safety sustainability policies are being adhered to
Giving levels for excavation
general setting out of services,drainage,electrical pits