Summary
Overview
Work history
Education
Skills
Languages
Affiliations
Accomplishments
Certification
References
Timeline
Generic

Erjon Sopi

Leicester

Summary

Offering strong analytical and numerical skills with a proactive approach to package management. Good awareness of project coordination between disciplines and communication through previous apprenticeship experience. Ready to use and develop skills in budgeting, contract and subcontractor packages as a Quantity Surveyor.

Overview

6
6
years of professional experience
5
5
years of post-secondary education
1
1
Certification

Work history

Assistant Quantity Surveyor

AB Construction
Burton-on-Trent, Staffordshire
12.2024 - Current


Overview


  • Production of Cost Plans within project timelines
  • Identified risks and opportunities at an early stage - demonstrating within a forecast CVR document
  • Attendance in Value Management meetings to agree contract values for retail Fit Out projects
  • Submissions of Valuations to client side QS and Project Managers
  • Agreement of Final Accounts and documenting variations throughout the project lifecycle


Project History


Assistant Quantity Surveyor on the Sainsbury’s account, I was responsible for commercial management of multiple retail projects, including refurbishments, fit-outs, and minor works across the store portfolio:


  • Sainsburys Santiago Roll out (£4.5m): works involving updating back of house kit to a large number of retail stores across the UK, including Coldstore installations, Floor Repairs and Bakery Equipment and Refrigeration
  • Sainsburys Convenience Stores (£600k - £1m): This predominantly involved the fit out of Sainsburys convenience stores following developer shell construction, including in house M&E design and installation of Coldstores, Security Systems


Assistant Quantity Surveyor

ISG CONSTRUCTION LTD
Birmingham, West Midlands
09.2019 - 09.2024


Overview


  • Subcontractor management; appointment, valuations and variations onsite through to agreement of final accounts.
  • Maintained records with suppliers to ensuring thorough cost control of prelims.
  • Produced profit plans, cashflows, monthly valuations and payment certificates with cost build-ups.
  • Carried out takeoffs using BluBeam software tool.
  • Predominantly operated under JCT Design & Build Contracts with brief experience with NEC.


Project History


  • Beauchamp College Leicester £14m Refurb (Sep 19 - Sep 20): Learned to measure off drawings and produced onsite subcontractor valuations for steel encasements, carpentry, partitions, fire stopping and flooring.
  • Platform 21 Birmingham £18m CAT B Fit Out (Nov 20 - Dec 21): Carried out site management rotation where I assisted in progress and quality records of trades, H&S compliance, sequencing of works and CCS Scheme.
  • Victoria Law Courts Birmingham £13m Grade II Refurb (Jan 22 - Feb 22): Produced methodologies for electrical and fire system updates including associated carpentry, ornate plastering and decoration works. Further works included refurbishments of windows, radiators and roofing.
  • National Probation Office Leicester & Nottingham £9m Refurb Mar 22 - Dec 22): Works included strip out of existing partition walls, M&E and flooring to update with new layout and M&E systems. Assisted in external valuations to for the PQS on a monthly basis.
  • Dosthill School £3m New Build (Jan 23 - Nov 23): 6 classroom extension including surrounding earthworks, landscaping and demolition of old classrooms. On this project I was responsible for the procurement and variation management of 25 plus packages, filling in for the redundancy of the Senior QS.
  • Emerge Surf Birmingham £300k PCSA Stage (Mar 24 - Aug 24): Monitoring changes in design and RIBA Stage 3 drawings, submitting tenders to 120 plus subcontractors and updating cost plans to reflect and agree the contract price.
  • Moseley Road Baths £11 Refurb (Aug 24 to Sep 24): Brief assistance on site, taking ownership of procurement of the following packages; lifts, carpentry and masonry works.

Education

Bachelor of Science - Quantity Surveying

University College of Estate Management
Reading
09.2019 - 08.2024

Skills

  • Proficient use of Microsoft tools; Excel, Word
  • BluBeam Measurement Software
  • Package Management
  • Subcontractor Documentation; Scope of Works, CSA etc
  • Attention to detail
  • Team Player - enjoy working with others


Languages

English
Native
Albanian
Fluent

Affiliations

  • Mechanics - Restoring Cars
  • 5 a side Football
  • Tennis

Accomplishments

  • Construction Management
  • Building Services

Certification

  • Full UK Manual Drivers License
  • CSCS Card

References

Riz Khan (QS former ISG) - 07722 003530

Marcus Bates (MQS former ISG) - 07739 749020


Timeline

Assistant Quantity Surveyor

AB Construction
12.2024 - Current

Assistant Quantity Surveyor

ISG CONSTRUCTION LTD
09.2019 - 09.2024

Bachelor of Science - Quantity Surveying

University College of Estate Management
09.2019 - 08.2024
Erjon Sopi