Accomplished Project Field Engineer with a proven track record at EnerMech, enhancing client satisfaction and safety through meticulous project management and engineering expertise. Skilled in relationship building and mechanical engineering knowledge, I've successfully delivered complex projects on time, demonstrating exceptional teamwork and collaboration. Excellent skills gained from years of experience in a variety of demanding environment
MAJOR PROJECT SUMMARY
Date: 2024
Duration: 8 weeks
Client & Country: Subsea7 - (Senegal)
Project Name: Sangomar Phase 1
Work scope: Leading teams on FPSO LSS during Precommissioning scopes of Risers. Scopes include riser Global Leak Testing, riser annulus vacuum testing, umbilical post hookup testing. Assisting with co-ordination of equipment setup, function testing and operations whilst ensure field paperwork is completed and issued
Date: 2023
Duration: 20 weeks
Client & Country: Saipem - (Ivory Coast)
Project Name: Baliene Phase 1
Work Scope: Leading teams on MSV FDS2 & FPSO Firenze during Precommissioning scopes of infield flowlines and risers. Scopes included riser filling and flooding, riser annulus vacuum testing, umbilical post hookup testing, global leak testing and dewatering of risers. Assisting with co-ordination of equipment setup, function testing and operations whilst ensure field paperwork is completed and issued
Date: 2023
Duration: 2 weeks
Client & Country: BP, Greater Plutonio FPSO (Angola)
Project Name: GTP GCT Outage 2023
Work Scope: Leading team as Supervisor for Pipe Freezing of 4” water cooling line
Date: 2023
Duration: 8 weeks
Client & Country: BW Offshore (Adolo FPSO -Gabon)
Project Name: Adola Ruche Phase II
Work Scope: Leading team as a field Engineer on the FPSO Adolo to Execute Nitrogen-Helium Leak Testing, Bolting & Flange Management
Date: 2022
Duration: 2 Weeks
Client & Country: Tullow (Ghana)
Project Name: FAM & MFAM Project
Work Scope: Offshore MFAM Installation Support for Jumper Installation
Date: 2022
Duration: 1 months
Client & Country: Modec (MV25 FPSO-Ghana)
Project Name: Shutdown Maintenance
Work Scope: Leading team as a field Engineer for Hot Bolting and flange management
Date: 2021
Duration: 6 months
Client & Country: TechnipFMC (Ghana)
Project Name: Tema LNG Terminal
Work Scope: Field lead for Hydrotesting, Dewatering & Drying of 13” flexible export pipeline
Date: 2020
Duration: 1 month
Client & Country: BW Offshore (Adolo FPSO -Gabon)
Project Name: Adolo Ruche Phase I
Work Scope: Supervisor for Nitrogen-Helium leak testing of newly built Modules (16 test pack)
Date: 2019
Duration: 2 weeks
Client & Country: Hunting/ENI (Ghana)
Project Name: OWWI(open well water Injection)
Work Scope: Offshore support on SSM for well interventions
Date: 2019
Duration: 1 month
Client & Country: Hunting/Tullow (Ghana)
Project Name: OWWI(open well water Injection)
Work Scope: Offshore support on SSM for well interventions
Date: Call Out (Continues)
Duration: Call Out
Client & Country: Hunting/Tullow (Ghana)
Project Name: FAM & MFAM Project
Work Scope: Site Integration Testing of Flow access module and offshore support during Jumper installations
Date: 2018
Duration: 1 month
Client & Country: MV25
Project Name: SBT Remediation
Work Scope: Small Bore Tubing Integrity
Date: 2018
Duration: 1 month
Client & Country: TechnipFMC (Ghana)
Project Name: Riser 15 Repairs
Work Scope: MEG Injection, hydrostatic testing of pulling head & riser
Date: 2017
Duration: 1 month
Client & Country: Modec Ghana (FPSO MV21)
Project Name: SBT Remediation
Work Scope: Small Bore Tubing integrity Management - Survey
Date: 2017
Duration: 5 months
Client & Country: Hyundai Heavy Industry (Congo)
Project Name: Moho Nord-(Hookup & commissioning of floating Production Unit-(FPSO Likouf)
Work Scope: Onshore Logistical & Technical support for Nitrogen-Helium leak testing (73 test packs for topside)
Date: 2016
Duration: 2 months
Client & Country: Hyundai Heavy Industry (Congo)
Project Name: Moho Nord-(Hookup & commissioning of Tension leg Platform)
Work Scope: Shift Supervisor for Nitrogen-Helium leak testing (35 test packs for topside)
Date: 2016
Duration: 2 months
Client & Country: Technip (Congo)
Project Name: Moho Nord-(Brown/Green field design, fabrication, pre-commissioning of Umbilicals, flowlines & Risers package for Subsea)
Work Scope: Shift supervisor for Vessel based hydrotesting of water injection, export/import lines
Date: 2015
Duration: 1 month
Client & Country: Modec (Ghana)
Project Name: Maintenance
Work Scope: Installation of manifold block/hoses and Small bore tubing survey
Date: 2014
Duration: 1 month
Client & Country: PetroSA (South Africa)
Project Name: Project Ikwehzi-(Subsea infrastructure development that ties inn to the FA
Work Scope: Shift Supervisor for Vessel base hydrotesting of Umbilicals
Date: 2011
Duration: 1 month
Client & Country: Technip (Ghana)
Project Name: Jubilee Phase 1A-(Expansion of existing subsea infrastructure. 5 production well, 3 water injection well
Work Scope: Trainee Field Engineer for Subsea pigging & Testing of water injection flow lines & wet packing frame
Date: 2011
Duration: 1 month
Client & Country: Dolphin Energy (Qatar)
Project Name: Dolphin LNG Project
Work Scope: Trainee Field Engineer for Nitrogen purging & leak testing
Date: 2010
Duration: 1.5 month
Client & Country: Agip KCO (Kazakhstan)
Project Name: Kashagan Offshore Hookup (HUPPCA)
Work Scope: Supervisor for Pre-commissioning – Rotating Equipment
Date: 2010
Duration: 2.5 months
Client & Country: Adamus Resources (Ghana)
Project Name: Nzema gold-(Construction of greenfield gold processing plant)
Work Scope: Pre-commissioning Site Supervisor
Date: 2009-10
Duration: 1 year
Client & Country: Qatargas (Qatar)
Project Name: QCX III & IV-(Construction of 2 LNG Trains of 7.8 mtpa each)
Work Scope: Site Supervisor for Pre-commissioning (rotating equipment)
Date: 2007-09
Duration: 2.5 years
Client &Country: Qatargas (Qatar)
Project Name: QGXII-(Construction of 2 LNG Trains of 7.8 mtpa each)
Work Scope: Site Forman for Pre-commissioning (rotating equipment)