ERDI AKKUS

ERDI AKKUS

Chester

Summary

Experienced Senior Planning, Cost Control, and Site Engineer with 12 years of experience in EPC energy, mining, and large-scale building projects. Proven track record in optimizing project schedules, controlling costs, and ensuring flawless execution. Proficient in Primavera P6, Asta Powerproject, SAP, MS Project, and NEC/FIDIC contracts. Consistently delivers projects on time and within budget. Passionate about fostering efficiency and innovation in complex engineering environments. Ready to contribute expertise to your company, leveraging technical and leadership skills to drive project success and add value.

Overview

11
11
years of professional experience

Work History

Senior Planning Engineer

ENKA CONSTRUCTION SA
12.2022 - Current

Client: Shotton Mill Limited (Eren Holding), Contractor: ENKA Construction SA

Project: The conversion and expansion of Shotton Paper Mill Project (an existing non-operational paper mill)

  • Ensured compliance with CDM Regulations and NEC4 contract requirements in project planning.
  • Developed and maintained project schedules for all work packages, including demolition, excavation, piling, concrete, precast, steel, cladding, architectural, MEP, and infrastructure works.
  • Prepared and tracked mitigation and target schedules, coordinating with subcontractors and in-house managers.
  • Monitored critical path activities, identifying delays and implementing recovery plans.
  • Led interface management, integrating subcontractor schedules.
  • Assessed compensation events and their time impact.
  • Conducted direct meetings with subcontractors to align schedules and resolve issues.
  • Prepared daily, weekly, and monthly progress reports for the client and senior management.
  • Led stakeholder meetings to review schedule updates and risks.

Planning and Cost Control Supervisor

ENKA UK CONSTRUCTION LIMITED
04.2021 - 11.2022

Client: General Electricity Company of Libya (GECOL), Contractor: ENKA in consortium with Siemens

Project: Tripoli West 671 MW Simple Cycle Power Plant (€403M). The project won the ENR 2023 Global Best Projects-Power/Industrial Award of Merit

  • Controlled and monitored total project expenditures, verifying and processing invoices and claims from suppliers, vendors, and subcontractors.
  • Managed cost centres and codes for project material and service requests, as well as purchase and service orders.
  • Prepared and maintained accurate project schedules, estimates, and budgets, ensuring compliance and effective fund management.
  • Tracked and updated the project budget, preparing quarterly forecast updates.
  • Monitored project expenditures, recorded running costs, and ensured alignment with budgeted costs for payment certificate preparation.
  • Prepared progress payment certificates for both clients and subcontractors.
  • Tracked contractual issues and assessed their cost impact.
  • Compiled and analysed weekly cost commitment reports, comparing forecasted budgets with committed, realised, and paid amounts.
  • Developed and maintained project schedules, including baseline management, resource loading, and progress updates.
  • Integrated earned value methods into cash flow analysis and project tracking.
  • Generated and analysed daily, weekly, and monthly progress reports.
  • Draughted and reviewed construction work schedules to ensure alignment with project goals.

Planning and Scheduling Engineer

ENKA UK CONSTRUCTION LIMITED
11.2019 - 03.2021

Client: Ministry of Electricity of Iraq (MOE), Lump Sum Turnkey (LSTK) contract in consortium with General Electric (GE)—Engineering, Procurement, Construction & Commissioning (EPCC)

Project: Dhi Qar 750 MW Combined Cycle Power Plant Project ($335M)

  • Developed and maintained the baseline schedule, integrating engineering, procurement, construction, and commissioning (EPCC) activities while ensuring compliance with contractual milestones.
  • Conducted monthly schedule updates, tracking project progress and identifying potential delays using critical path analysis (CPA).
  • Monitored site progress through daily, weekly, and biweekly lookahead schedules, ensuring alignment with project execution plans.
  • Coordinated progress tracking and reporting, including daily, weekly, biweekly, and monthly reports, integrating earned value management (EVM) for cost and schedule control.
  • Managed drone-based site progress monitoring, capturing and archiving aerial photographs to document construction advancements.
  • Provided planning support for commissioning and start-up activities, ensuring a smooth transition to combined cycle operation.
  • Collaborated with multidisciplinary teams to resolve schedule conflicts and optimise resource allocation for efficient project execution.

Technical Office Manager

Gürbüz Cons. Contracting Co. Inc.
12.2018 - 07.2019

Client: Agence pour l'Amélioration et le Développement du Logement (A.A.D.L)
Project: 4800 Apartment Housing Development ($125M)

  • Managed contracts and progress payments for subcontractors, ensuring financial accuracy and compliance.
  • Developed and monitored the work schedule and budget, optimizing cost and time performance.
  • Prepared and tracked employer progress payments and handled administrative correspondence.
  • Generated daily, weekly, and monthly activity reports, providing structured project insights.
  • Conducted site progress tracking, identifying delays and optimizing production timelines.

QA/QC Field Engineer

AKON Group International JSC
03.2018 - 12.2018

Client: Tumad Mining Ind. And Trad. Inc. (Nurol Holding) Ivrindi Gold and Silver Mine Beneficiation Plant Project, ($ 34M)

  • Follow-ups, quality controls and inspections at the site
  • Inspection of steel fixing, formwork and concrete
  • Regulation of related quality documents
  • Able to complete 1 mt thick slabs pours around 1500 m2
  • Interacted effectively with the site engineering team and field staff to coordinate work that complied with design and construction documents.
  • Assessed processes to ensure that construction progressed as scheduled and met contract specifications.
  • Provided review of design modifications and requests for clarification.

Cost Control Engineer

Yenigün Construction Co.
08.2017 - 02.2018

Client: Royal Saudi Air Force / Perini Management Services, INC

F-15 Fleet Modernization Program, Electronic Warfare Range ($ 80M)

  • Prepared budget, cost comparison tables, measured performance with EVM, unit price analysis and unit manhour analysis
  • I worked with engineers, designers, purchasers, and suppliers on changes and adjustments to cost estimates.
  • Provided accurate estimates by defining scope, timelines, potential setbacks, and limitations.
  • Reviewed and approved invoices and payments, verifying the accuracy of expenses.
  • Reported quarterly budget cost estimations and control, revisions, and evaluation of deviations.
  • Tracked site progress, workforce, and issues for real-time project monitoring with daily reporting.
  • Updated schedules on Primavera P6, cost performance, and risk assessments for management review weekly
  • Provided high-level progress, financial analysis, and contractual insights for stakeholders with monthly reporting.

Project Controls Engineer

Gürbağ Group
03.2017 - 08.2017

Owner: l'Agence pour l'Amélioration et le Développement du Logement (A.A.D.L) 2000+1000 Apartment Housing Project ($ 90M)

  • Built working schedules and updated regularly.
  • Created a material supply program that works well with the baseline schedule and order tracking, from placing to delivery, enabling precise and timely execution.
  • Worked with engineers, designers, purchasers, and suppliers on changes and adjustments to cost estimates and unit price analysis.
  • Used Excel efficiently for cost analysis, budget, cash flow, and cost control and reporting them
  • Daily, weekly, and monthly construction site reports

Technical Office Manager

Gürbüz Cons. Contracting Co. Inc.
01.2016 - 03.2016

Client: Offices de Promotion et de Gestion Immobilières (OPGI)
Projects: 3000 & 2300 Apartment Housing Developments ($160M Total)

  • Managed cost control and financial oversight, verifying subcontractor progress payments against actuals.
  • Developed and maintained the master procurement program, ensuring timely material and contract execution.
  • Tracked contracts and milestones, issuing regular reports to management for risk mitigation.
  • Ensured compliance with Lump-Sum contract requirements, compiling necessary documentation.
  • Created and adjusted work schedules to optimise resource allocation and meet project deadlines.
  • Analysed project outcomes and provided structured daily, weekly, and monthly reports for performance tracking.

Technical Office QS Engineer

Gürbüz Cons. Contracting Co. Inc.
07.2014 - 01.2016

Central Finance and Contracts Unit (CFCU) | Kırklareli Reception & Removal Center (EU-IPA, €15M)
Managed cost control, budgeting, and forecasting, ensuring compliance with EU funding.

  • Prepared tender documents, BOQs, and procurement strategies for contract management.
  • Assisted in planning and scheduling, integrating cost and time controls.
  • Analyed commercial risks, contract variations, and claims for dispute resolution.
  • Developed progress and cost reports (daily, weekly, monthly) for performance tracking.
  • Coordinated with stakeholders and subcontractors to optimise project execution.
  • Conducted work valuations, payments, and compliance monitoring.

Construction Manager

Istanbul Cevahir Akter İnşaat
10.2013 - 07.2014
  • Residential Project including 14 Storey & 75 House & Carpark ( $2M )
  • Coordinated with site personnel, clients, and local government officials to achieve on-time project delivery.
  • Reduced costs by streamlining contract bidding and procurement processes to assure the best prices for materials and services.
  • Planned and implemented a comprehensive construction schedule to guarantee completion of the project on time and within budget.
  • Monitored subcontractor operations and applied effective time, resource, and money management strategies.

Education

Bachelor of Science - Civil Engineering

Gaziantep University
Gaziantep
01-2013

Skills

  • Scope management
  • Structural engineering
  • Agile project management
  • Procurement management
  • Critical path and risk analysis
  • Budget and cost estimation
  • Health and safety regulations
  • AutoCAD proficiency
  • Primavera P6 proficiency
  • Microsoft Project proficiency
  • Asta Powerproject proficiency
  • Power BI proficiency

Timeline

Senior Planning Engineer

ENKA CONSTRUCTION SA
12.2022 - Current

Planning and Cost Control Supervisor

ENKA UK CONSTRUCTION LIMITED
04.2021 - 11.2022

Planning and Scheduling Engineer

ENKA UK CONSTRUCTION LIMITED
11.2019 - 03.2021

Technical Office Manager

Gürbüz Cons. Contracting Co. Inc.
12.2018 - 07.2019

QA/QC Field Engineer

AKON Group International JSC
03.2018 - 12.2018

Cost Control Engineer

Yenigün Construction Co.
08.2017 - 02.2018

Project Controls Engineer

Gürbağ Group
03.2017 - 08.2017

Technical Office Manager

Gürbüz Cons. Contracting Co. Inc.
01.2016 - 03.2016

Technical Office QS Engineer

Gürbüz Cons. Contracting Co. Inc.
07.2014 - 01.2016

Construction Manager

Istanbul Cevahir Akter İnşaat
10.2013 - 07.2014

Bachelor of Science - Civil Engineering

Gaziantep University
ERDI AKKUS