Meticulous Pipefitter promoting background in coordinating jobs and setting up work sites. Experienced in safety processes, regulations and pipe selection. Offering successful career history spanning more than 35 years. Experienced pipefitter professional with strong leadership and relationship-building skills very safety aware
This is an ongoing decommissioning work scope, mostly involving capping off pipework.
Including fabricating, assembling, and installing.
This was on a pre-shutdown scope.
The work involved changing out valves and spools on the sea chests and fire pumps.
The work was carried out on schedule and without incident.
This was a pre-shutdown scope involving preparing the various job sites for the shutdown of the rig.
Equinor Marinor
This was a three-week shutdown carried out on time and without incidents.
Total Elgin and North Alwin
Those were general pipefitting and plating scops, including pipe supports, replacing pipework,and replacing steelwork.
General fabric mantinance.
Total Culzean
I was the nightshift pipefitter helping the mechanical fitters to change out PSVs and changing out one of the turbines.
Total North Alwin
This work comprised changing out the seawater pipework during a partial shutdown of the rig and was carried out in the time allotted .
This was a three-week shutdown on the Armada Kraken.
The work involved valve changeouts and re-routing new pipework.
This is as a shut-down foreman on the Total North Alwyn
This was fitting flexible hoses from the Valaris Rowan Norway to the BP Mungo platform for fire cover when the Norway will be drilling for new wells.
This work was to update the Total Gas Plant in order to operate under a lower volume of Gas.
This is on the Total Elgin.The work involves replacing the Hazardous drains pipework,cutting out penetrations through bulkheads and tanks for the new pipework and fitting new flanges for welding to the pipework.
This was on a pre-shutdown and shutdown on a shutdown; my duties included being a Performing Authority controlling all work sites.
I completed the work on time and without any lost time accidents.
This was on the Total North Alwyn.
The work involved replacing separators,pipework and then pipe supports.
This was the first shutdown on the Total Culzean and was completed on time and without any accidents.
This was on the Total Grifon and was a 3-week trip.
I was the P.A. for this role.
This was on the Clair Ridge Project offshore where I was involved with the leak testing,fabricating pipework,fitting new spools and valves.
I was offshore on the Fortys Charly and the Heather doing shutdown work involving replacing pipe spools and valves.
This work involved working in whisky distilleries doing maintenance on different sites.
I started for Wood Group on the Andrew Area Development Project. This was the B.P. Andrew oil rig.
I was working on the Fortys and the Beryls, which are Apache owned.
This work was for everyday maintenance and also for shutdowns.
This was a four-week job on a carbon fibre factory shutdown.
This was on a new build Tesco store.
I was working for Isleburn at Nigg Bay we were building cranes for an offshore oil rig in Brazil.
This was in the Global fabrication shop in Invergordon making up spools from isometric drawings to be fitted to a drill rig that was tied up in Invergordon.
Due to the downturn in work in Scotland, I had to travel for work. This included
England on power stations,the T5 tunnel for Heathrow,RAF,Army and Naval Bases, etc.
In the Netherlands, I was based in the town of Vlissingen, where I worked in the Herema yard,in shipyards and in various Engineering workshops.
I made up sections of a bridge linking Sweden to Denmark in Sweden.
Also, in a shipyard.
Northern Ireland in Harland and Wolfe
I spent much time in the Republic of Ireland on new water treatment plants.
Canada, I worked on the Oil Sands Project in Alberta at Fort MacMurray.
I worked between the oil yards of Barmac at Nigg Bay and MacDermids in Ardersear.
We were building Jackets,Topsides and Modules for the North Sea
This work was for companies like Total,Britoil and Shell, to name some.
We were building Sub Sea Spiders,Turrets for F.P.C.Os Modules Jackets, etc.
ECITB- Pipefitting Competency Certification
OFFSHORE
OPITO
FOET
MIST
OFFSHORE MEDICAL
ISSOW P.A.
PRESSURE TESTING
WORKING AT HEIGHT
ASBESTOS AWARENESS
ABRASIVE WHEELS
CONFINED SPACE ENTRY
TMJI 10,11,19,20
LOKRING
MIST
NORWEGIAN ESCAPE CHUTE
CCNSG, SAFETY PASSPORT
CSCS, SKILL CARD
Screwed pipework
Treading machining
Vitrolic pipework
Fire systems pipework
Fabricating pipework for welding