Summary
Overview
Work History
Education
Skills
Education And Professional Training
References
Hobbies and Interests
Career Project Achievements
Timeline
2f
Dom Harker

Dom Harker

Construction Site Manager / Appointed Person
Carrickfergus

Summary

With over 29 years of experience in construction, I serve as a Site Manager / Appointed person at Severfield (NI) Ltd, where I focus on overseeing complex construction projects and ensuring operational excellence. I specialize in lifting operations, digital drawings, and construction management, consistently driving projects forward with a commitment to safety and precision. My work emphasizes maintaining high safety standards and delivering exceptional results through collaboration and disciplined planning. With expertise in lifting operations and method statements, I ensure operational efficiency and safety compliance while contributing to the success of large-scale construction projects. My military background has instilled a disciplined, proactive approach to planning, precision, and team leadership. Recognized as a strong leader with a hands-on approach.

Overview

35
35
years of professional experience

Work History

Site Manager/ Lifting Appointed Person

Severfield NI LTD
05.2021 - Current
  • Preparing Method statements, lift plans and managing daily operations.
  • Lead Appointed Person planning the oversight of multiple crane types and lifting strategies.
  • Site team leadership, resource coordination, and quality assurance.
  • Ensured 100% adherence to health and safety regulations.
  • Oversaw daily site operations ensuring compliance with safety regulations and quality standards.
  • Coordinated project schedules and resource allocation to optimize workflow efficiency.
  • Led team meetings to assess project progress and address challenges proactively.
  • Implemented process improvements resulting in enhanced productivity across multiple construction sites.
  • Mentored junior staff, fostering skill development and adherence to best practices.
  • Developed strategic plans aligning site activities with organizational objectives and client expectations.

Site Manager / Lifting Appointed Person

William Hare Group LTD
07.2017 - 05.2021
  • Directed high-profile erection projects across the UK.
  • Supervised crane operations, conducted team briefings, and maintained compliance with RAMS.
  • Controlled logistics of materials, equipment, and checklists.
  • Directed site operations ensuring compliance with health and safety regulations.
  • Managed project timelines, coordinating resources to meet critical deadlines.
  • Oversaw workforce productivity, implementing strategies to enhance team efficiency.
  • Ensured compliance with local regulations, obtaining necessary permits and coordinating inspections throughout the construction process.

Senior Site Supervisor / Lifting Appointed Person

William Hare Group LTD
01.2016 - 07.2017
  • Oversaw site teams and lifting procedures on high-profile projects.
  • Maintained strict adherence to safety procedures and engineering documentation.
  • Oversaw daily site operations, ensuring adherence to safety and quality standards.
  • Mentored junior supervisors, fostering skill development and team cohesion.
  • Conducted regular site inspections to identify hazards and maintain compliance with regulations.
  • Facilitated strong communication between project managers, architects, engineers, clients, and other relevant parties throughout the course of each project.
  • Trained new team members on site policies and procedures.
  • Maintained records and logs of work performed and materials and equipment used.
  • Oversaw personnel safety and efforts at work site.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Implemented best practices and safe operating procedures.
  • Worked with personnel and managers to meet strict timelines.

Steel Erector Supervisor

J&D Pierce Contracts Ltd
07.2014 - 12.2015
  • Supervised lifting teams and crane operations.
  • Reviewed and executed method statements and erection plans.
  • Supervised steel erection projects, ensuring compliance with safety standards and regulations.
  • Conducted regular inspections of structural assemblies to guarantee integrity and precision.
  • Collaborated with engineering teams to interpret blueprints and technical specifications accurately.
  • Conducted thorough inspections of completed steel structures to guarantee adherence to design specifications and quality requirements.
  • Exceeded project deadlines through diligent work ethic and efficient task prioritization in high-pressure situations.
  • Trained new team members on proper steel erection techniques and safety protocols to maintain high-quality standards.

Steel Erector Foreman

Severfield UK
02.2001 - 12.2013
  • Managed a steel erection team across major UK builds.
  • Key liaison between engineers, management, and safety officers.
  • Supervised steel erection processes, ensuring compliance with safety regulations and industry standards.
  • Trained and mentored junior steel erectors, enhancing skills and promoting best practices.
  • Operated heavy machinery, such as cranes and forklifts, to facilitate efficient movement of materials onsite.
  • Erected structural steel and iron frameworks for bridges, buildings and other structures.
  • Coordinated with crane or signaled equipment operators to lift and position structural steel members and hoist beams, girders, and columns to correct positions.

Steel Erector

D W Broxholme
07.1998 - 01.2001
  • Performed structural erection tasks and steel assembly using tower cranes and MEWPs.
  • Erected steel frameworks for commercial and industrial structures, ensuring structural integrity and compliance with safety standards.
  • Operated heavy machinery, including cranes and hoists, for efficient movement of steel components on-site.

Steel Erector/Fabricator/Welder

M A Brown Steel Services
07.1996 - 07.1998
  • Part of a team erecting steel structures.
  • Hands-on steel remedial works, and welding.
  • Utilized advanced rigging techniques to safely lift and position heavy steel components during installation phases.
  • Operated heavy machinery, such as cranes and forklifts, to facilitate efficient movement of materials onsite.
  • Assembled and welded structural frameworks according to project specifications.

Private Soldier - 2nd Battalion The Parachute Regt

HM Forces
07.1990 - 09.1995
  • Infantry soldier in rifle company A Company 3 Platoon.
  • Support Company specializing on anti-tank weapon systems.
  • Physical Training Instructor leading soldiers for fitness sessions on a daily basis.

Education

No Degree -

Thomas Magnus Upper School
Newark, Nottinghamshire
05.1990

Skills

  • Lifting Operations & Crane Management
  • Steel Erection Management
  • Health & Safety (HSE) Compliance
  • Method Statements & Risk Assessments (RAMS)
  • Equipment & Material Logistics
  • BIM/Trimble Expertise
  • Appointed Person / Lift Supervisor Expertise
  • Crane Software Expertise

Education And Professional Training

Thomas Magnus Upper School, Newark, Nottinghamshire, 09/01/88, 05/01/90, GCSEs, NVQ Level 6 - Construction Site Management, NVQ Level 5 - Appointed Person (Lifting Operations), Crane Supervisor, MEWPS for Managers, Slinger/Signaler, First Aid at Work, Telescopic Handler: all sizes excluding 360 slew, MEWP-Boom: vehicle mounted & self-propelled

References

  • Martin Campbell, Construction Manager, J&D Pierce (Contracts) LTD, mcampbell@jdpierce.co.uk
  • Bill Fletcher, Construction Manager, Bill.Fletcher@hare.com
  • Steve Davis, Director, Steve@fvfltd.com
  • Liam Burns, Construction Manager, Liam.burns@severfield.com

Hobbies and Interests

I have a strong passion for fitness training and regularly dedicate time to gym workouts. This commitment not only helps me maintain physical health but also enhances my focus and discipline in both personal and professional aspects of my life.

Career Project Achievements

  • Multi storey high rise building - Leadenhall Street Cheese Grater, Scalpel 52 Lime Street, 100 Bishopsgate, Aldgate Tower and 21 Moorfields Moorgate.
  • Oil Refineries/Power Stations/Power Plants - Arques, France, Battersea Power Station Phase 2, Intel- Dublin Leixlip.
  • Sports stadium - Stratford Olympic Stadium 2012, Manchester Commonwealth Games Stadium.
  • Airport Terminals - All terminals at Heathrow including Air Traffic Control Tower at Terminal 5, Gatwick Airport and Glasgow Airport.
  • Multi-span portal building - Ellesmere Port, Liverpool Docks.
  • Bridges - Squinty Bridge Glasgow and Gatwick North Terminal Passenger Transfer Bridge.
  • Shopping Centre - Westfield Derby, Westfield London Phase 2.
  • Office block refurbishment - Cannon Street Railway Station.
  • Dismantling - Stratford Jump Factory, Basketball Arena 2012 Olympics.

Timeline

Site Manager/ Lifting Appointed Person

Severfield NI LTD
05.2021 - Current

Site Manager / Lifting Appointed Person

William Hare Group LTD
07.2017 - 05.2021

Senior Site Supervisor / Lifting Appointed Person

William Hare Group LTD
01.2016 - 07.2017

Steel Erector Supervisor

J&D Pierce Contracts Ltd
07.2014 - 12.2015

Steel Erector Foreman

Severfield UK
02.2001 - 12.2013

Steel Erector

D W Broxholme
07.1998 - 01.2001

Steel Erector/Fabricator/Welder

M A Brown Steel Services
07.1996 - 07.1998

Private Soldier - 2nd Battalion The Parachute Regt

HM Forces
07.1990 - 09.1995

No Degree -

Thomas Magnus Upper School
Dom HarkerConstruction Site Manager / Appointed Person