Experienced JIB approved Electrician with 40 years in construction, knowledgeable in current standards and codes of practice. Expertise spans on/offshore oil and gas, petrochemical, nuclear, and automation process control, covering engineering, construction, QA/QC inspection, testing, commissioning, and maintenance. Proven ability to complete tasks efficiently within time constraints across diverse environments in the U.K. and overseas.
Upgraded and installed E/C/I process systems in food manufacturing facility, enhancing operational functionality.
Led electrical installation and commissioning of Iddenshall Grange solar park project, a 17.57 MW facility, ensuring seamless integration with the local electricity network.
Enhanced E/C/I process control systems on waste water treatment facility to support environmental compliance and operational excellence for united utilities Ltd.
Executed LED lighting upgrade programme, oversaw installation, testing, and pre-commissioning of new lighting system on Mersey Queensway tunnel project.
Assisted with lighting upgrade programme at Airbus manufacturing facility.
Supported installation, testing, and commissioning tasks within factory HV/LV switch rooms and plant rooms.
Aided in safe isolation and energisation (LOTO) procedures as appointed low voltage person for electrical systems.
Conducted ATEX inspections and surveys to ensure safety compliance during CD4/TAR shutdown for Bilfinger on Essar oil ltd Stanlow Manufacturing Complex, contributing to operational integrity. i was also appointed as a competent electrical person by Essar which is still in date until 03/08/26.
Assisted in installation and commissioning of ATEX equipment to enhance safety compliance.
Supported operational improvements at Shell Bitumen Stanlow manufacturing complex to increase efficiency.
Facilitated optimisation of loading processes at new tanker bulk storage facility .
ZENOBE CAPENHURST.
E/C/I/ installation & commissioning work on the first 100 MW battery which will be the first in the world to absorb reactive power directly from a transmission network and the largest grid -connected battery in Europe.
Temporary cover working within the electrical maintenance department at the point of Ayr Gas Terminal a top tier COMAH site for Petofac .Main duties included isolation/ de-isolation of electrical systems & equipment in accordance with company operating procedures and standards, including LV/HV power distribution systems. battery /UPS systems . Monitor the work carried out by vendors /contractors on site. Maintain & inspect all site ATEX equipment ensuring work programmes & schedules are completed safely effectively within planned timescales. Record & input accurate data into the SAP system for recording working time.
Supported ATEX inspection team in verifying compliance of all ATEX equipment with ICE/EN60079-14 -17 standards during construction phase.
Assisted in ensuring safety protocols were adhered to across project sites.
Assisted in carrying out installation, modifications, and commissioning services for British Pipeline Agency Limited.
Supported ATEX survey and inspection work on multi-product systems.
Contributed to operations at various top-tier COMAH sites across the UK, including Kingsbury and Buncefield.
Helped install Newson Gale static earth protection systems for loading and unloading of road tankers.
Facilitated the installation of Rotork process actuators for flow control in process systems.
Participated in the hook-up of new West London prover loop skid at Buncefield terminal.
Installed and upgraded ATEX ventilation and dust extraction systems on chemical production plant, enhancing safety and compliance for manufacturing countermeasures and energetics for militaries and security forces.
Supported the CF Fertilisers engineering department by carrying out upgrades and modifications to Emerson Delta V safety instrumented systems (SIS) on the ammonium and nitrate acid plants, including glanding and terminating cables into marshalling cabinets and field devices according to engineering drawings and P&ID loop drawings. Assisted with pre-commissioning activities.
Working on Various projects within oil /gas /nuclear/ renewable sectors in the U.K.,Europe & middle east .Main duties & responsibilities were the following monitoring & reporting QA/QC aspects of the contracted work scope, including compliance to the quality plan inspection & test and other QA/QC documentation . Witness & submit daily/weekly reports regrading each vendor / suppliers progress. The inspections covered factory acceptance tests, ATEX certification & conformity, preservation & packaging. Full documentation reviews for compliance to specifications reporting any quality problems to the client as they arise recommending corrective & preventive actions.
Carrying out E/I installation inspection duties on new waste to energy plant for Dong energy. Main duties were carrying E/I inspections within a new tank farm area ensuring all work was carried out to project specifications.
Carrington CCGT power station project.
Ensured compliance with standards
Managed E/C/I inspection and quality control activities during the construction phase of the project while overseeing compliance with DF Energy contract requirements and specifications.
Performed the following main duties:
Provided detailed daily, weekly, and monthly quality reports and attended project meetings.
Carry out inspections, surveillance & overseeing contractors work activities on installations of ATEX certified equipment in accordance with IEC6079 parts 14 & 17.As well as witnessing testing of LV/MV/HV cables, switchgear/ transformers, UPS & battery, power generation, lighting & small power , Instrumentation equipment.
Reported non-conformances and corrective actions with documented evidence and recommendations for effective resolution and close-out.
Carry out walk downs with the client & sub- contractors on daily basis recommending corrective & preventive actions as required.
Review all materials & certificates of calibration of equipment used by contractors & vendors are within date.
Review , mark-up & comment on contractors ITP,s ensuring witness & hold points included in the ITP,s are implemented. Verify As- built drawings & final document.Monitor & review E/C/I punch lists for timely close out.
Provide quality control inspection to EVAP D in accordance with relevant specifications & ITP.
Ensured quality control activities outlined in quality plans were executed by subcontractors on-site and at their facilities.
Assisted contractor personnel in preparing for inspection and testing activities.
Verified compliance of all plant and equipment delivered to EVAP D project with contract specifications and safety requirements.
Ensure workmanship & quality standards are maintained.
Perform visual & dimensional inspections.
Ensure that all installation records are maintained & signed.
Produce & circulate inspection reports ( daily /weekly)
During inspection & test activities ensure that the contractors inspection & test equipment is calibrated & within date.
Ensure the production environment & equipment is suitable for manufacture & report progress to the QC inspection coordinator.
Witness FAT/SAT tests.
Endorse records/data dossiers in line with approved activities.
Ensuring LTQR are generated concurrently with the manufacturing activities & ensure verification of the records is carried out in a timely manner.
Review & accept the final LTQR package.
Carry out final inspection &issue company certificate of release / documents & complete contract close out reports.
Attend kick off & quality control review meetings as required.
Outlined main duties as follows:
Completed punch lists and witnessed electrical insulation and continuity testing, ensuring client satisfaction and adherence to standards.
Monitored electrical operations, ensuring compliance with project specifications and relevant codes and practices.
Prepared ATEX documents and test sheets, red-lining as-built drawings for accurate final package handover to the client.
Managed the commissioning process of a new subsea well during a short-term offshore contract.
Oversaw the glanding and termination of electrical control cables for the umbilical on the platform.
Facilitated testing and documentation processes, resolving client issues, and providing project progress reports to the onshore project engineer.
Assisted in monitoring and reporting quality assurance and quality control aspects of contracted work.
Supported compliance with the quality plan through documentation review.
Witnessed and submitted daily flash reports concerning supplier progress.
Conducted inspections for FAT tests, ATEX certification, and conformity preservation and packaging.
Reviewed documentation for adherence to BP specifications and reported any quality issues as they arose.
Recommended corrective and preventive actions where necessary.
Executed electrical/instrumentation work scope for new drilling BOP package installation, contributing to successful rig reactivation on CNR Ninian North platform.
Supported upgrades, modifications, and tie-ins of electrical/instrumentation systems with existing infrastructure.
Helped ensure safety compliance through regular inspections of electrical installations.
Conducted health and safety/toolbox talks before each shift, enhancing team awareness of safe working practices.
Executed various fire and gas modifications and upgrade projects on ConocoPhillips SNS assets from installation through to commissioning while following the permit to work system.
Conducted electrical and instrumentation inspections during construction, installation, testing, and commissioning phases to ensure compliance with project standards.
Inspected switch rooms and associated major electrical and power systems for adherence to safety and operational requirements.
Completed inspection test plans by conducting tri-party walk downs and monitoring punch list items prior to handover to ensure readiness.
Assisted teams in executing surveys and inspections of E/I equipment on national grid gas compressor stations and LNG sites.
Captured data and redlined drawings and schematics as necessary on LV/MV/HV systems.
fire and gas detection systems and turbine/UPS/metering systems.
Communicated with operations/control teams to facilitate daily toolbox talks and PTW preparation.