
Dedicated quality assurance professional with expertise in precision measurement and technical drawing interpretation. Proven ability to maintain high performance under pressure while ensuring safety and efficiency in material preparation. Proficient in utilizing hand and power tools, with a strong focus on meticulous project execution and materials ordering. Aiming to apply technical skills in a role that prioritizes detail-oriented work and safety standards.
I worked on several multi-million pound projects all over the UK installing pipework and valves of all sizes, erecting pipe bridges and i was the slinger/signaller for the full 2 years. Also installed and commissioned new equipment for smooth integration into existing systems.
Projects I worked on :
Finham water treatment plant
Raf cranwell
Bran Sands
Uttoxeter water treatment plant
Projects I worked on:
Charlton Lane water treatment plant
Bran Sands
Melborne (Severn-Trent)