Summary
Overview
Work History
Education
Skills
Affiliations
Additional Information
Timeline
Generic
Chandra Prakash Tiwari

Chandra Prakash Tiwari

Deputy Executive Director

Summary

An accomplished Executive Director with extensive experience in leading technical teams, overseeing plant operations, and implementing process improvements to enhance productivity, efficiency, and profitability. Demonstrating strong leadership skills, technical expertise in mechanical, electrical, instrument, and civil maintenance, and proven ability to manage pre-commissioning and commissioning activities. A results-driven professional with expertise in quality assurance, project management, budget control, and compliance with safety, environmental, and regulatory requirements. Possessing strong analytical skills and the ability to develop reports to drive decision-making and process improvements. A strategic thinker with excellent communication and interpersonal skills, able to build strong relationships with stakeholders and vendors.

Overview

29
29
years of professional experience

Work History

Deputy Executive Director

Dalmia Cement Bharat Limited
Sundargarh
2021.05 - Current


  • Successfully headed an integrated cement plant with a production capacity of 1.50 million tons per annum, along with a captive power plant with a capacity of 25MW, a WHRS system with a power generation capacity of 6.5MW, and a full-fledged AFR system.
  • Led all functions, including mining, technical, HR & administration, finance, commercial, packing & dispatch, power plant, and project management, with a team of around 1200-1300 employees.
  • Responsible for managing complete operations and maintenance of the integrated cement and power plant, ensuring the highest level of safety, security, efficiency, and productivity.
  • Successfully executed all upgradation and improvement projects within the approved project budget, with quality and zero accidents, while ensuring timely compliance.
  • Successfully produced and delivered high-quality cement to the market, meeting standard quality norms and ensuring customer satisfaction and profitability by optimizing production costs
  • Currently heading the maintenance and reliability function of the entire Dalmia Cement Bharat Limited Group, which includes 14 cement plants at different locations in India, with a total production capacity of 35 million tons per annum.


Significant Achievements:

  • Broke all-time records of cement and clinker production in a day, month, and year during FY'22, demonstrating exceptional operational excellence and efficiency.
  • Achieved the highest efficiency of the unit, ensuring the lowest possible variable and fixed costs, while maintaining the highest quality standards.
  • Ensured zero lost time injury (LTI), demonstrating a strong commitment to safety and compliance, and achieving a safe work environment for employees.
  • Successfully managed stakeholders to ensure there were no industrial relation (IR) issues, while maintaining a productive and harmonious work environment.
  • Demonstrated strong leadership skills and effective management, resulting in the smooth operation of the plant with optimal productivity, profitability, and compliance.

Technical Director

Eurocement Group
Moscow
2017.03 - 2021.04


  • Led, directed, controlled, and managed technical teams and works for Eurocement Holding, the largest cement manufacturing company in Russia with 60 million tons/annum capacity and 16 plants, achieving the highest levels of safety and environmental standards, best operational performance and efficiency at lowest cost.
  • Administered and controlled the installation and commissioning of new equipment and organized tests and inspections to ensure operational effectiveness of plants and utilities.
  • Approved drawings, layouts, diagrams, technical specifications, and cost estimates for erection and commission of major projects of the group (brown and green field).
  • Directed and approved predictive and preventive schedules of key equipment for increasing machine utilization, reliability, and productivity, reducing mean time between failures.
  • Managed all technical and managerial aspects, including review and validation of reports on performance analysis, planning for higher productivity, and implementation of fuel and energy conservation measures.
  • Controlled implementation of cost-saving techniques and modifications to achieve substantial reduction in O&M expenditures and work within budget.

Senior Maintenance Manager

Indocement, Heidelberg Cement Group
Jakarta
2012.01 - 2017.03


  • Spearheaded maintenance function for the entire Indocement Group, overseeing 13 plants with a total capacity of 25 million tons/annum across three locations in Indonesia.
  • Successfully implemented a maintenance improvement plan (MIP) and maintenance management system for the entire Indocement Group, resulting in increased efficiency and reduced downtime.
  • Monitored plant performance, advised for improvements, and guided the technical department of 13 units with around 1500 employees, directly reporting to the technical director (board member) of Indocement.
  • Managed predictive and preventive maintenance programs and drove continuous improvement by implementing timely inspection, proper planning, execution, and analysis steps.
  • Introduced and implemented HC Group CIP concept, resulting in a 15% cost reduction and quality enhancement of manufacturing processes.
  • Reduced downtime by 30% by implementing reliability concepts and HC Group MIP plan, while effectively monitoring inventory, spare parts, and consumables, and analyzing root causes of incidents and accidents related to cement plants.

Maintenance Manager

Tanzania Portland Cement Company, Heidelberg Cement Group
Dar Es Salaam
2010.04 - 2011.12


  • Spearheaded the maintenance department for a cement plant, leading the entire technical team consisting of three departmental managers, six sectional managers, 15 engineers and supervisors, and 80 workmen.
  • Managed and supervised the entire cement plant's maintenance aspects, from crusher to the packing plant, ensuring smooth and efficient operations.
  • Achieved a 10-15% increase in plant reliability, while reducing maintenance costs by 5% and inventory by 10%, through effective management strategies and process improvements.

Assistant General Manager

Lafarge India Private Limited
Bilaspur, CG
1994.05 - 2010.03


  • Spearheaded the mechanical department for a cement plant, leading a team of eight sectional managers, 21 engineers and supervisors, and 55 workmen.
  • Managed and supervised the entire cement plant's mechanical aspects, from crusher to the packing plant, ensuring smooth and efficient operations.
  • Achieved a 5% increase in plant reliability and reduced mechanical maintenance costs by 10% through effective management strategies and process improvements.

Education

PG Diploma - General And Financial Management

IGNOU
Delhi, India
2008.05 - 2009.05

Diploma - Management

IGNOU
Delhi, India
2004.05 - 2005.05

Degree - Mechanical Engineering

Institute of Engineers
West Bengal, Kolkata
2001.05 - 2002.05

Diploma - Mechanical Engineering

I.E.R.T
Prayagraj
1987.05 - 1990.05

Skills

    Business and Factory Management

undefined

Affiliations

Certificate of Fellow with the Institution of Engineers (India) - Awarded in recognition of the exceptional knowledge, contribution and experience in the engineering field.

Additional Information


Salary and Notice Period:

  • Current CTC (1.20Cr. INR / 150,000 USD) Per Annum + Perks (Fully Furnished Housing + Company Car with Driver + House Support Staff)
  • Expected Salary for Position in India/Abroad: Negotiable
  • Notice Period: 03 months

Timeline

Deputy Executive Director

Dalmia Cement Bharat Limited
2021.05 - Current

Technical Director

Eurocement Group
2017.03 - 2021.04

Senior Maintenance Manager

Indocement, Heidelberg Cement Group
2012.01 - 2017.03

Maintenance Manager

Tanzania Portland Cement Company, Heidelberg Cement Group
2010.04 - 2011.12

PG Diploma - General And Financial Management

IGNOU
2008.05 - 2009.05

Diploma - Management

IGNOU
2004.05 - 2005.05

Degree - Mechanical Engineering

Institute of Engineers
2001.05 - 2002.05

Assistant General Manager

Lafarge India Private Limited
1994.05 - 2010.03

Diploma - Mechanical Engineering

I.E.R.T
1987.05 - 1990.05
Chandra Prakash TiwariDeputy Executive Director