Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

Bogdan Marian Tuculeasa

Chingford,Greater London

Summary

Results-driven Mechanical Project Manager with strengths in managing complex mechanical services for residential and hotel projects. Coordinates site teams, subcontractors, and suppliers to ensure compliance with safety and quality standards, delivering projects on time and within budget. Drives continuous improvement through effective risk assessment and method statement production.

Overview

1
1
Certification
12
12
years of professional experience

Work History

Mechanical Project Manager

Strucktor MEP
Kings Cross / Gloucester Road
04.2025 - Current

Managed mechanical services delivery for residential and hotel projects safely, on programme, within budget at Tribeca and Kensington Forum Hotel

  • Led site teams, supervisors, subcontractors, suppliers, and specialist contractors across all phases.
  • Managed installation, testing, and commissioning of air source heat pump systems and heating infrastructure.
  • Coordinated plant room installations, including pumps, pressurisation units, vessels, valves, and equipment.
  • Reviewed construction drawings and technical submissions to resolve installation issues.
  • Produced and reviewed risk assessments and method statements for legal and company compliance.
  • Conducted QA inspections, managed snagging, and maintained standards and specification compliance.
  • Managed labour resources, approved timesheets, monitored productivity, and kept site records.
  • Prepared material take-offs, managed procurement schedules, and ordered materials for programme needs.
  • Obtained and reviewed supplier and subcontractor quotations for cost control and value engineering.
  • Managed subcontractor variations, valuations, and required commercial reporting.
  • Issued site instructions, coordinated programme updates, and drove milestone delivery.
  • Oversaw pressure testing, chemical flushing, commissioning, and commissioning handover documentation preparation.
  • Coordinated O&M manuals, commissioning certificates, and final handover documentation.
  • Liaised with clients, consultants, main contractors, and other trades for project delivery.
  • Maintained strict compliance with health and safety regulations, quality standards, and procedures.

Mechanical Project Manager

Strucktor MEP
Bayswater, City of Westminster
09.2021 - 04.2025

The Whiteley Development

Managed the delivery of mechanical fit-out packages on a high-end luxury residential and mixed-use development, ensuring projects were completed safely, on time, and within budget.

  • Led and coordinated site teams, subcontractors, suppliers, and specialist contractors throughout all phases of the project.
  • Oversaw the installation of high-specification designer sanitary ware and ensured all installations met client and consultant requirements.
  • Reviewed and coordinated construction drawings, technical submissions, and design information, resolving technical and installation issues.
  • Produced and reviewed Risk Assessments and Method Statements (RAMS), ensuring all activities were carried out safely and in accordance with company procedures and statutory regulations.
  • Conducted quality assurance and quality control inspections (QA), managed snagging activities, and ensured all works complied with project specifications and industry standards.
  • Managed labour resources, approved timesheets, monitored productivity, and maintained accurate site records.
  • Prepared material take-offs, managed procurement schedules, and ordered materials to ensure timely delivery and continuity of works.
  • Obtained, reviewed, and managed supplier and subcontractor quotations, ensuring best value and cost control throughout the project.
  • Managed price works packages, variations, subcontractor valuations, and commercial reporting requirements.
  • Issued and managed site instructions, coordinated programme updates, and ensured works progressed in line with project milestones.
  • Coordinated commissioning processes and ensured all commissioning certificates, O&M manuals, and handover documentation were completed accurately.
  • Liaised closely with clients, consultants, main contractors, and other trades to ensure successful project delivery.

Mechanical Site Manager

Strucktor MEP
Woolwich, Royal Borough of Greenwich
03.2020 - 09.2021

Building 10 Royal Arsenal

  • Managed and coordinated all mechanical installation works on a large-scale residential development project, ensuring delivery to programme, budget, quality, and safety requirements.
  • Led site supervisors, operatives, and subcontractors, allocating resources and monitoring progress to achieve project milestones.
  • Managed the installation of HDPE drainage systems, including soil, waste, and rainwater pipework.
  • Oversaw the installation and commissioning of rainwater harvesting systems and associated mechanical services.
  • Managed the installation of district heating.
  • Supervised the installation, testing, and commissioning of Heat Interface Units (HIUs).
  • Coordinated plant room and tank room installations, including pumps, pressurisation units, vessels, valves, and associated equipment.
  • Conducted quality assurance and quality control inspections (QA), completed inspection records, and ensured all works met required standards.
  • Reviewed technical drawings, specifications, RAMS, and construction programmes to ensure accurate project delivery.
  • Managed pressure testing, flushing, commissioning activities, and preparation of handover documentation.
  • Liaised with clients, consultants, project managers, and other trades to ensure efficient coordination and successful project completion.
  • Maintained strict compliance with health and safety regulations, permit-to-work systems, and company procedures throughout the project lifecycle.

Plumber

Strucktor MEP
Highams Park, Greater London
08.2019 - 03.2020

Improved residential development delivery by completing plumbing installations to deadlines at Naseberry Court Project.

  • Supported reliable heating and hot water outcomes through heat interface unit commissioning.
  • Enhanced indoor air performance by installing MVHR with connected ductwork components.
  • Reduced rework risk by completing first-fix and second-fix plumbing installations correctly.
  • Strengthened system performance by installing and testing pipework to specifications.
  • Maintained safe site operations by following health and safety procedures consistently.

Plumber

VMA
London, City of London
08.2018 - 08.2019

Completed plumbing installations on 1 major commercial build at 100 Liverpool Street.

  • Installed sanitary ware and fittings across multiple store areas.
  • Set up hot and cold water systems, drainage, and associated pipework.

Plumber

R Benson
Barnet, London Borough of Barnet
06.2017 - 07.2018
  • Completed refurbishment and new-build plumbing across residential and commercial sites.
  • Installed and maintained hot and cold water systems and sanitary ware.
  • Fitted drainage pipework and carried out first-fix and second-fix plumbing works.

Plumber

Merit Holdings
Ware, Herefordshire
08.2016 - 06.2017
  • Installed commercial and industrial plumbing systems in pharmaceutical manufacturing environments daily.
  • Fitted stainless steel and copper pipework systems to project requirements.
  • Installed heating, chilled water, hot water, and process pipework systems.

Assistant Plumber

Calitek Grup
Bucharest, Romania
03.2014 - 07.2016
  • Delivered smoother installation and maintenance by assisting qualified engineers on site.
  • Improved plumbing and mechanical installation capability through practical, day-to-day work.
  • Supported client satisfaction through reliable installation, repairs, and plumbing system maintenance.
  • Met service expectations on residential and commercial projects with dependable support.

Education

NVQ Level 6 - Construction Site Management

GQA
London
01-2021

NVQ Level 3 - Bussiness Administation

LITC College
London
01-2019

NVQ Level 2 - Plumbing

ASIM
Bucharest
01-2014

Certificate of Higher Education - Mecatronist Technician

Grup Scolar Danubius
Calarasi
01-2012

Skills

  • Project management
  • Procurement management
  • Supplier management
  • Risk assessment
  • Quality assurance
  • Compliance management
  • Technical documentation
  • Mechanical installation
  • Resource allocation
  • Cost control
  • Client coordination
  • Health and safety
  • Problem-solving
  • Deadline management
  • Calm under pressure

Languages

English
Upper Intermediate
B2
Romanian
Proficient
C2

Certification

  • SMSTS certified
  • IOSH Managing Safley certified
  • Level 3 First Aid At Work

Timeline

Mechanical Project Manager

Strucktor MEP
04.2025 - Current

Mechanical Project Manager

Strucktor MEP
09.2021 - 04.2025

Mechanical Site Manager

Strucktor MEP
03.2020 - 09.2021

Plumber

Strucktor MEP
08.2019 - 03.2020

Plumber

VMA
08.2018 - 08.2019

Plumber

R Benson
06.2017 - 07.2018

Plumber

Merit Holdings
08.2016 - 06.2017

Assistant Plumber

Calitek Grup
03.2014 - 07.2016

NVQ Level 6 - Construction Site Management

GQA

NVQ Level 3 - Bussiness Administation

LITC College

NVQ Level 2 - Plumbing

ASIM

Certificate of Higher Education - Mecatronist Technician

Grup Scolar Danubius
Bogdan Marian Tuculeasa