Summary
Overview
Work history
Skills
References
Timeline
Generic

Billy Turton

Stirling,Stirling

Summary

Dedicated professional with extensive expertise in trench excavation, road surfacing, and pipe laying. Demonstrates proficiency in manual handling training compliance and efficient tool handling, ensuring optimal site excavation and road surface preparation. Skilled in soil compaction techniques, asphalt spreading, and concreting and shuttering techniques, with a strong understanding of ground conditions. Committed to delivering high-quality foundation preparations and ground levelling for successful project outcomes.

Overview

2
2
years of professional experience

Work history

Groundworker (Drainage)

Tough Construction
Drumchapel
08.2024 - 08.2025
  • Achieved successful excavation tasks with use of appropriate machinery.
  • Contributed to infrastructure projects by constructing roads and footpaths as per design specifications.
  • Carried out drain installation to prevent water accumulation on sites.
  • Completed groundwork tasks within stipulated deadlines for optimal workflow progression.

Groundworker (Monoblocks)

Mulholland
01.2025 - 07.2025

Groundworker (Drainage)

Strain Construction
East Kilbride
07.2023 - 08.2024
  • Focused on trench support tasks to prevent collapses during work processes.
  • Installed utility pipelines for essential services provision.
  • Completed groundwork tasks within stipulated deadlines for optimal workflow progression.
  • Carried out drain installation to prevent water accumulation on sites.
  • Supported construction by carrying out tasks related to drainage and foundation works.

Skills

  • Manual handling training compliance
  • Trench excavation proficiency
  • Soil compaction techniques knowledge
  • Road surfacing expertise
  • Asphalt spreading expertise
  • Pipe laying expertise
  • Efficient tool handling
  • Site excavation
  • Road surface preparation
  • Concreting and shuttering techniques
  • Foundation preparations
  • Ground levelling and compaction
  • Kerb laying capability
  • Understanding of ground conditions

References

References available upon request.

Timeline

Groundworker (Monoblocks)

Mulholland
01.2025 - 07.2025

Groundworker (Drainage)

Tough Construction
08.2024 - 08.2025

Groundworker (Drainage)

Strain Construction
07.2023 - 08.2024
Billy Turton