Summary
Overview
Work history
Skills
Certification
References
Timeline
Generic

Billy Edmeades

Liverpool,Merseyside

Summary

A highly-motivated and widely-experienced Construction Manager, looking to take the next step in my professional development.


With 20 years' industry experience, I bring wide-ranging knowledge of construction techniques and standards, alongside excellent commercial awareness, and a strong focus on SHEQ compliance.


I am self-motivated, calm within pressurised situations. I have a demonstrable track record of using my communication and organisation skills to deliver projects to budget, programme, and SHEQ standards. I am always keen to better myself and enjoy taking on new and challenging roles, I consider myself very hands on and like to drive projects forwards in any way I can.

Overview

20
20
years of professional experience
1
1
Certification

Work history

Construction Manager

Allied Infrastructure Management Limited
Leigh, Wigan
07.2022 - 01.2026

Responsible for the daily management of the operational workforce at Manchester Airport (MAN), including both direct and supply chain resources.


Allied Infrastructure deliver a wide variety of works at MAN, which is the business' largest and most significant client. Core works include: reactive repairs, cyclical maintenance, asphalt re-surfacing, replacement of PQ concrete bays, and others. In addition to our core "airside" works, Allied are regularly engaged to deliver "landside" works, which include aspects as highways works and car park construction.


All works have to be delivered in a fast-paced and operationally challenging environment. I work with our Supervisors to ensure that works are delivered within the limited possession windows granted by the client I also liaise with the wider business to ensure that aspects such as Security Passes are in place,


In my capacity as Construction Manager, my key responsibilities include:


  • Daily planning and management of resources to ensure our portfolio of projects progress in a timely manner.
  • Briefing and supervision of construction activities to ensure compliance with SHEQ standards, client requirements, and relevant legislation.
  • Liaison with Project Managers, clients and designers to resolve technical issues on projects.
  • Liaison with key stakeholders associated to the airfield - including Security, Operations and MASHCO (fuel network operator).
  • Management and support of dedicated operational team for MAN, including all aspects of HR, Learning & Development, Performance Management, and Annual Appraisals. I also help to support the recruitment of new personnel where required.



Foreman / General Foreman,

Balfour Beatty Vinci Joint Venture (BBV) - HS2
Long Itchington, Warwickshire
01.2021 - 07.2022

Management of multiple teams of joiners, steel fixers and groundworks gangs on a complex and high-profile scheme which formed part of the HS2 Main Works Civils Contracts (MWCCs). Key scope elements included: the construction of tunnel slurry treatment plant FRC, bulk earthworks, MSV locomotive route, segment storage and precast yard.


In my role as a General Foreman, I was responsible for:


  • Carrying out daily briefings to ensure a clear understanding of the planned works.
  • Management of plant and labour to ensure sufficient resources were in place to deliver the programme.
  • The production and delivery of task briefings,
  • Inspections and recording of Temporary Works, ensuring safety and compliance with relevant legislation.
  • Sub-contactor management.
  • Health and Safety inspections and reporting, to help reinforce stringent safety standards.

Drainage Foreman, M6 J13-15 Smart Motorway Scheme

Kier (Sub-Contract with Danny Sullivan)
Stafford, Staffordshire
10.2018 - 01.2021

Management of multiple teams of operatives and plant carrying out: drainage, road widening and re-construction, modular concrete structures, bulk excavation, PT15 carriageway construction, lay-by and Emergency Recovery Area (ERA) construction. Duties included:


  • Daily task briefings.
  • Point of work risk assessments.
  • Plant and excavation checks.
  • Plant and labour allocation.
  • Temporary works inspections,

Section Supervisor

Laing O'Rourke
Manchester, Manchester
03.2018 - 10.2018

Management of a team of men and plant carrying out: box dig and road construction, construction of a new and upgraded junctions, drainage, service ducting, kerbing and flagging, structural concrete forming and pouring. Duties included:


  • Daily briefings.
  • Risk assessments.
  • Plant and labour allocation
  • Administration of quality sign-off procedures.

Section supervisor

Kier (Sub Heeney) - Merseylink
Widnes, Halton
10.2016 - 03.2018

Management of teams of men carrying out: bulk excavation and muck-away, carriageway construction, piling, drainage, ducting and traffic-signal systems, retaining walls, reinforced concrete structures.

Foreman

Schofield and Sons Ltd
Manchester, Manchester
02.2014 - 10.2016

Managing teams of men installing reinforced concrete foundations and slabs, drainage and drainage connections on public roads, Works on public carriageway to haul-roads and sewers on commercial developments.

Foreman

Bemus Construction
Manchester
01.2013 - 12.2013

Managing gangs installing: drainage and manholes, piling platforms, construction of new road and junction, RC perimeter beams, slabs, pile caps, service and street-light ducting.

Ganger

Littlewood Limited
Kent, Kent
01.2008 - 12.2012

Managing and working within a team of operatives undertaking civil work under Personal Track Safety (PTS) conditions. This included: kerbing & flagging, pouring and finishing concrete, shuttering, timber hoardings and fencing.

Operative / Ganger

Edmeades Construction Limited
Kent, Kent
01.2006 - 12.2008

Managing and working within a team of men installing drainage, new roads, footways and driveways etc. on a new build housing development.


My duties included: operating plant to dig drainage and road boxes, laying kerbs and flags, hand laying Tarmac to foot ways and drives, installing road gullies and associated drainage and manholes, pouring concrete for foundations, and building road and pavement formations.


I was also responsible for giving daily briefings, recording daily dairy, recording day works and timesheets.

Skills

  • Detailed and wide-ranging knowledge of construction techniques and standards
  • Experienced in leading multi-disciplinary teams
  • Able to manage pressurised working environments, with challenging and competing deadlines
  • Excellent communication and stakeholder management skills
  • Experienced in managing personnel issues, including mentoring, training, wellbeing, and performance management
  • Able to add value during the pre-construction stage regarding aspects such as constructability, estimating, and programming


Certification

  • Site Manager's Safety Training Scheme (SMSTS).
  • Site Environmental Awareness Training Scheme (SEATS).
  • IOSH Managing Safely.
  • Temporary Works Supervisor (TWS).
  • NVQ Level 7 Construction Management.
  • First Aid.
  • EUSR.
  • Numerous other short-courses and accreditations.

References

References available upon request.

Timeline

Construction Manager

Allied Infrastructure Management Limited
07.2022 - 01.2026

Foreman / General Foreman,

Balfour Beatty Vinci Joint Venture (BBV) - HS2
01.2021 - 07.2022

Drainage Foreman, M6 J13-15 Smart Motorway Scheme

Kier (Sub-Contract with Danny Sullivan)
10.2018 - 01.2021

Section Supervisor

Laing O'Rourke
03.2018 - 10.2018

Section supervisor

Kier (Sub Heeney) - Merseylink
10.2016 - 03.2018

Foreman

Schofield and Sons Ltd
02.2014 - 10.2016

Foreman

Bemus Construction
01.2013 - 12.2013

Ganger

Littlewood Limited
01.2008 - 12.2012

Operative / Ganger

Edmeades Construction Limited
01.2006 - 12.2008
Billy Edmeades