Experienced pipefitter, plumber, and welder with an NVQ Level 3 qualification and a strong background in heating and ventilation for commercial and industrial properties. Proficient in MIG, TIG, and MMA welding techniques, demonstrating a strong work ethic and commitment to quality workmanship. I am Capable of interpreting drawings and schematics to ensure compliance with building regulations and requirements. Reliable team player with a methodical approach, adept at prioritising tasks and working independently to achieve project goals.
1) Installed heating riser from the energy centre in the sub basement to the various floors of the building.
2) Measured,Cut, fabricated and installed brackets and clips to support pipework.
3) Took deliveries of materials,plant and equipment for safe and accessible storage.
4)Complied with health and safety regulations to prevent injury to self and others within working environment.
Assisting with other day to day site activities.
1)Site setup and putting up of storage space and receiving the first batch of equipment and fittings from suppliers.
2) Fabricated and installed rain water and Soil Vent pipework(SVP) in HDPE fusion weld.
3) 1st & 2nd Fixed high end, high spec bathroom fixings in domestic units.
4) Installed HIUs primary and secondary pipework in domestic units.
5) Installed Heating, Chilled & condense pipework to fan coil Units inside commercial units.
6) Measured,Cut and Installed Bracketry for the commercial gas boilers and Chiller units in the Plant room.
7) Installed Boosted Cold-water services from the tank room in sub basement to feed carious domestic units on various floors. Brazed the pipes for jointing.
8) Pressure tested the above mentioned installations using air first then water.
1) Installed bracketry and clips to support pipework to Air Handling Units. Prefabricated and Installed LCS barell pipework to the AHUs. I used Victaulic jointing method.
2) Installed bracketry and clips to support pipework to a network of cast iron SVP and RW pipework in the underground car park. Enzym couplings were used for the jointing method.
3) Installed service and control Valves on the system to enable remote operation of the system via the Building Management System(BMS).
1) First fix installed HDPE soil Vent pipework on various floor for the units.
2) First fix installed heating,hot and cold water services from the corridors into the units in copper.
3) Pressured tested the work,repared leaks and had it witnessed by client`s representative.
1)Prefabed and installed various diameter Low Carbon Steel(LCS) pipes using various jointing techniques such as welding, Victaulic jointing and threaded joints within the energy centre/plant room to connect to various equipment such as Combined Heat and Power plant (CHP),Buffer Vessels, Modular Gas boilers,dosing pots. etc.
1) Prefabricated,brackets,clips for cold water riser and manifolds for water meters for various floors and riser cupboards.
2) Brazed the 4inch (BCWS) boosted cold water services from the cold water storage tank room for various risers.
3) Did an Air and Water pressure test to the installation for leaks and clients` certificates.
1)Worked on domestic units on first and second fixing of Bathrooms,Kitchen, Heatind and cold water services to blocks.
2) Installed SVP pipework in HDPE and terrain glued pipework.
Given upon request.