Summary
Overview
Work history
Education
Skills
Languages
Timeline
Generic

Bernard McHugh

LONDON, Select County

Summary

Experienced Signaller with strong background in railway inspection and operations. Monitors movement to safeguard teams and protect equipment. Excellent record of top-quality performance and reliable attendance. Attentive railway professional promotes 24 years of industry experience. Monitors and maintains railway equipment and resolves hazards to support smooth and safe operations. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

23
23
years of professional experience

Work history

Signaller

Networkrail
Marylebone, City of Westminster
08.2022 - Current
  • Met daily requirements by interpreting and properly applying work instructions.
  • Operated signals to control railway traffic movement.
  • Coordinated removal of all obstacles, snow and railway track debris to maximise safety.

Signaller

Network rail
Victoria, London
09.2020 - 08.2022
  • Met daily requirements by interpreting and properly applying work instructions.
  • Operated signals to control railway traffic movement.
  • Controlled railway traffic flow over line sections with control panels or signal boxes.
  • Composed inspection reports on rail defects, positions and locations.

Signaller

Network Rail
West Midlands signalling centre, Birmingham
10.2016 - 09.2020
  • Met daily requirements by interpreting and properly applying work instructions.
  • Operated signals to control railway traffic movement.
  • Controlled railway traffic flow over line sections with control panels or signal boxes.
  • Composed inspection reports on rail defects, positions and locations.
  • Coordinated removal of all obstacles, snow and railway track debris to maximise safety.

Signaller

Network Rail
Droitwich Spa, Worcestershire
07.2004 - 09.2016
  • Met daily requirements by interpreting and properly applying work instructions.
  • Operated signals to control railway traffic movement.
  • Controlled railway traffic flow over line sections with control panels or signal boxes.
  • Composed inspection reports on rail defects, positions and locations.
  • Coordinated removal of all obstacles, snow and railway track debris to maximise safety.

Signaller

Network Rail
Bollo Lane, London
04.2002 - 09.2004
  • Met daily requirements by interpreting and properly applying work instructions.
  • Operated signals to control railway traffic movement.
  • Controlled railway traffic flow over line sections with control panels or signal boxes.
  • Composed inspection reports on rail defects, positions and locations.
  • Coordinated removal of all obstacles, snow and railway track debris to maximise safety.

Signaller

Network Rail
Acton Canal Wharf, London
12.2000 - 04.2002
  • Met daily requirements by interpreting and properly applying work instructions.
  • Operated signals to control railway traffic movement.
  • Controlled railway traffic flow over line sections with control panels or signal boxes.
  • Composed inspection reports on rail defects, positions and locations.
  • Coordinated removal of all obstacles, snow and railway track debris to maximise safety.

Education

A-Levels - English

The London Oratory School
London
09.1984 - 07.1990

A-Levels - History

London Oratory School
London
09.1984 - 07.1990

A-Levels - Political Studies

London Oratory school
London
09.1984 - 07.1990

GCSEs - Maths

The London Oratory School
London
09.1984 - 07.1990

GCSEs - English literature and Language

The London Oratory School
London
09.1984 - 07.1990

GCSEs - Physics

The London Oratory School
London
09.1984 - 07.1990

GCSEs - Classical Studies

The London Oratory School
London
09.1984 - 07.1990

GCSEs - French

The London Oratory School
London
09.1984 - 07.1990

Skills

  • Assessing risks
  • [System] safety
  • Protective services
  • Identifying hazards
  • Safety guidelines
  • Preventing incidents
  • Track regulations
  • Incident reporting
  • Signalling equipment

Languages

English
Native

Timeline

Signaller

Networkrail
08.2022 - Current

Signaller

Network rail
09.2020 - 08.2022

Signaller

Network Rail
10.2016 - 09.2020

Signaller

Network Rail
07.2004 - 09.2016

Signaller

Network Rail
04.2002 - 09.2004

Signaller

Network Rail
12.2000 - 04.2002

A-Levels - English

The London Oratory School
09.1984 - 07.1990

A-Levels - History

London Oratory School
09.1984 - 07.1990

A-Levels - Political Studies

London Oratory school
09.1984 - 07.1990

GCSEs - Maths

The London Oratory School
09.1984 - 07.1990

GCSEs - English literature and Language

The London Oratory School
09.1984 - 07.1990

GCSEs - Physics

The London Oratory School
09.1984 - 07.1990

GCSEs - Classical Studies

The London Oratory School
09.1984 - 07.1990

GCSEs - French

The London Oratory School
09.1984 - 07.1990
Bernard McHugh