Inspection of lamination, seam / laps, and crack other defect in plate and pipe are measured & also its thickness using UT meth.
Dimensional measurement of metal thickness as corroded material for wall thickness.
Visual Inspection of each pass during welding.
Familiar with the base materials and consumable specifications and that welding filler metals used are as specified for materials.
Project: SOUTH NEMBA – SNX JACKET
Contractor: DSME
Client: CHEVRON
QC Welding Inspector
SONAMET
WELDING INSPECTION ACTIVITIES AND JOB RESPONSIBILITY:
Perform inspection before welding, during welding, and after welding in accordance with approved WPS and project specification.
Check the welding preparation, fit up, dimensional control according to WPS and specification.
Check the end preparation of part to be welded shall conform to the joint design as specified the drawing and draw up in the applicable welding procedure specification.
During the welding ensure that welding is done in compliance with the applicable WPS and specification.
Checking the inter pass temperature periodically.
Visual inspection, the welds shall be in accordance with applicable category mentioned in drawing and the corresponding acceptance criteria.
If reject during the visual inspection, report to supervisor as well to welding foreman / supervisor for the correction action.
Weld finally accepts are requested for NDT by qc supervisor to NDT subcontractor.
Ensure that all Structural welding shall be conforming, as minimum, to the acceptance criteria as defined in AWS D1.1 2006 and TOTAL specification GS EP STR 301.
Large Bore piping specification are B31.3, GS EP PVV 611 the acceptance for visual inspection shall be as per ASME B31.3.
Small bores follow the FMC WDS – 000015 AND GS EP PVV 611. Specification.
Project: Kizomba Satellites PH II
Client: Esso and GE Oil & Gas
Welding Inspector
SONAMET
WELDING INSPECTION ACTIVITIES AND JOB RESPONSABILITIES:
I follow up duplex and super duplex welding according to the quality system of ISO 3834-2, and witness welders' qualification test for the project according ASME IX, as Applicable.
I follow welding process accordance with document No AOKD-VGE-UPZZZ-076010.
All NDT activities with accordance with ASNT LEVEL3, EN473, LEVEL3.
The visual inspection according with ASME B31.8, and following visual inspection, volumetric examination, surface examination.
Project: Kizomba Satellites PH II
Client: Esso and GE Oil & Gas
Mechanical Coordinator
Spie Oil in Gas Service
Cabinda, Angola
2024.03 - 2026.03
Working in Facilities Engineering Department (FE) as Mechanical Coordinator
My main objective is follow‑up the mechanical constructions activities, coordinate Turn Around Activities follow up and inspect it as per Facility engendering (FE) construction procedures, and Engineering projects specifications.
Project Site Advisor
Spie Oil in Gas Service
Cabinda, Angola
2023.09 - 2024.03
Project Site Advisor
Spie Oil In Gas Service
Cabinda , Angola
2023.09 - 2024.03
Project Site Advisor
Spie Oil in Gas Service
Cabinda , Angola
2023.09 - 2024.03
Working in Facilities Engineering Department (FE) as Project Site Advisor
my main objective is follow‑up the constructions activities inspect it as per FE
construction procedures, and Engineering projects specifications.
Mechanical Supervisor
Cabgoc and Chevron
2019.04 - 2023.09
Working in Facilities Engineering Department (FE) as Mechanical Supervisor, my main objective is follow-up the constructions activities inspect it as per FE construction procedures, and Engineering projects specifications.
Contractor: Spie Oil & Gas
Mechanical Inspector
Cabgoc and Chevron
2017.02 - 2019.03
Working as Mechanical Inspector in Facilities Engineering Department (FE Follow up the construction activities, inspect it as per Engineering procedure, and projects specifications.
Contractor: Applus Velosi
QC Specialist
GE (General Electric)
2014.02 - 2016.10
Follow up Assembly, welding, and work pressure test according Factory acceptance Test procedure for Water Injection Xmas Tree, and Production Xmas Trees.
Follow up Flushing Sample according Factory acceptance Test Procedure.
Follow up Assembly Items According Assembly Drawing or Book.
Follow up Valve Verification Test According Test Procedure.
Follow up Xmas Tree Insulation, According Insulation Specification.
Follow up Extend Factory Acceptance test According Test Procedure.
Follow up SCM Test According Test Procedure.
Follow up Xmas Tree Visual Inspection During the All step above.
Follow up Xmas Tree Final Inspection According QC Final Check List.
Project: Kizomba Satellites PH I & ANGOLA BLOCK 15/06 WEST HUB
Client: Esso & ENI
QA/QC- Welding Inspector
SONAMET Fabrication and Test Plan – Double joints
2011.12 - 2014.02
WELDING INPECTIONS ACTIVITIES AND JOB RESPONSIBILITY:
Check the setting of the PFM & the beveling tool bit.
Acceptance Criteria: Fit – up beveling as per WPS.
Check the material after cutting to size.
Ensure that identification code is transferred to each section of item to adjustments of DJ.
Acceptance criteria: Presence of the correct identification number.
Visual inspection of edges preparation length and high/ low check for each weld.
Check welding material to use are in compliance with the storage conditions and the applicable WPS.
Acceptance Criteria: handling & storage procedure for welding consumable.
Check the welder & welding operators are qualified.
Acceptance criteria: API 1104. Welding of pipeline and related and facilities.
Acceptance Criteria: GS EP PLR 421, Site welding of carbon steel pipeline to API 1104.
Check correct WPS, consumables and welding parameter are being used for each type of weld.
Visual inspection of weld 100%
Acceptance criteria: GS EP PLR 421, Site welding of carbon steel pipeline to API 1124 (Mild intermediate and sever sour service).
Contractor: SUBSEA 7
Client: TOTAL
Project: Clove Project Sur
Education
Bacharel Degree - Electromechanical Engineering
Oscar Ribas- University
Luanda, Angola
Skills
Computer Operation: Familiarize in MS-office window
LANGUAGES
English
Portuguese
INTERESTS
I like Reading books, watching TV and move, play Football with friend and make exercise.