Overview
Work history
Education
Skills
LANGUAGES
INTERESTS
Timeline
Generic
Augusto Manuel

Augusto Manuel

Overview

14
14
years of professional experience

Work history

QC - Welding Inspector

SONAMET
  • WELDING INXPECTIONS ACTIVITIES AND JOB RESPONSABILITY:
  • Checking of consumables used in welding to ensure compliance with project specification.
  • Checking of material test report or certification in compliance with Material specification.
  • Checking of weld joint preparation and peripheral edge of flat plate.
  • Ensure welding process, preheat and Interpass temperature are in accordance to approved specification.
  • Monitor Welders performance and to ensure that they performed with the limits of their qualifications.
  • Ensure that essential variables are in accordance to approved specifications.
  • Ensure safe and proper welding practices are employed at all times.
  • Ensure that heat treatment is performed under control and approved procedures.
  • Carried visual and dimensional inspections.
  • Verification of repair work and repair weld.
  • Preparation of inspection report and documentation of all related fabrication inspection and tests report.
  • To measure planar discontinuities, esp. lamination, crack incomplete fusion, inclusions & voids.
  • Inspection of lamination, seam / laps, and crack other defect in plate and pipe are measured & also its thickness using UT meth.
  • Dimensional measurement of metal thickness as corroded material for wall thickness.
  • Visual Inspection of each pass during welding.
  • Familiar with the base materials and consumable specifications and that welding filler metals used are as specified for materials.
  • Project: SOUTH NEMBA – SNX JACKET
  • Contractor: DSME
  • Client: CHEVRON

QC Welding Inspector

SONAMET
  • WELDING INSPECTION ACTIVITIES AND JOB RESPONSIBILITY:
  • Perform inspection before welding, during welding, and after welding in accordance with approved WPS and project specification.
  • Check the welding preparation, fit up, dimensional control according to WPS and specification.
  • Check the end preparation of part to be welded shall conform to the joint design as specified the drawing and draw up in the applicable welding procedure specification.
  • During the welding ensure that welding is done in compliance with the applicable WPS and specification.
  • Checking the inter pass temperature periodically.
  • Visual inspection, the welds shall be in accordance with applicable category mentioned in drawing and the corresponding acceptance criteria.
  • If reject during the visual inspection, report to supervisor as well to welding foreman / supervisor for the correction action.
  • Weld finally accepts are requested for NDT by qc supervisor to NDT subcontractor.
  • Ensure that all Structural welding shall be conforming, as minimum, to the acceptance criteria as defined in AWS D1.1 2006 and TOTAL specification GS EP STR 301.
  • Large Bore piping specification are B31.3, GS EP PVV 611 the acceptance for visual inspection shall be as per ASME B31.3.
  • Small bores follow the FMC WDS – 000015 AND GS EP PVV 611. Specification.
  • Project: Kizomba Satellites PH II
  • Client: Esso and GE Oil & Gas

Welding Inspector

SONAMET
  • WELDING INSPECTION ACTIVITIES AND JOB RESPONSABILITIES:
  • I follow up duplex and super duplex welding according to the quality system of ISO 3834-2, and witness welders' qualification test for the project according ASME IX, as Applicable.
  • I follow welding process accordance with document No AOKD-VGE-UPZZZ-076010.
  • All NDT activities with accordance with ASNT LEVEL3, EN473, LEVEL3.
  • The visual inspection according with ASME B31.8, and following visual inspection, volumetric examination, surface examination.
  • Project: Kizomba Satellites PH II
  • Client: Esso and GE Oil & Gas

Mechanical Coordinator

Spie Oil in Gas Service
Cabinda, Angola
2024.03 - 2026.03

Working in Facilities Engineering Department (FE) as Mechanical Coordinator

My main objective is follow‑up the mechanical constructions activities, coordinate Turn Around Activities follow up and inspect it as per Facility engendering (FE) construction procedures, and Engineering projects specifications.

Project Site Advisor

Spie Oil in Gas Service
Cabinda, Angola
2023.09 - 2024.03

Project Site Advisor

Spie Oil In Gas Service
Cabinda , Angola
2023.09 - 2024.03

Project Site Advisor

Spie Oil in Gas Service
Cabinda , Angola
2023.09 - 2024.03

Working in Facilities Engineering Department (FE) as Project Site Advisor

my main objective is follow‑up the constructions activities inspect it as per FE

construction procedures, and Engineering projects specifications.

Mechanical Supervisor

Cabgoc and Chevron
2019.04 - 2023.09
  • Working in Facilities Engineering Department (FE) as Mechanical Supervisor, my main objective is follow-up the constructions activities inspect it as per FE construction procedures, and Engineering projects specifications.
  • Contractor: Spie Oil & Gas

Mechanical Inspector

Cabgoc and Chevron
2017.02 - 2019.03
  • Working as Mechanical Inspector in Facilities Engineering Department (FE Follow up the construction activities, inspect it as per Engineering procedure, and projects specifications.
  • Contractor: Applus Velosi

QC Specialist

GE (General Electric)
2014.02 - 2016.10
  • Follow up Assembly, welding, and work pressure test according Factory acceptance Test procedure for Water Injection Xmas Tree, and Production Xmas Trees.
  • Follow up Flushing Sample according Factory acceptance Test Procedure.
  • Follow up Assembly Items According Assembly Drawing or Book.
  • Follow up Valve Verification Test According Test Procedure.
  • Follow up Xmas Tree Insulation, According Insulation Specification.
  • Follow up Extend Factory Acceptance test According Test Procedure.
  • Follow up SCM Test According Test Procedure.
  • Follow up Xmas Tree Visual Inspection During the All step above.
  • Follow up Xmas Tree Final Inspection According QC Final Check List.
  • Project: Kizomba Satellites PH I & ANGOLA BLOCK 15/06 WEST HUB
  • Client: Esso & ENI

QA/QC- Welding Inspector

SONAMET Fabrication and Test Plan – Double joints
2011.12 - 2014.02
  • WELDING INPECTIONS ACTIVITIES AND JOB RESPONSIBILITY:
  • Check the setting of the PFM & the beveling tool bit.
  • Acceptance Criteria: Fit – up beveling as per WPS.
  • Check the material after cutting to size.
  • Ensure that identification code is transferred to each section of item to adjustments of DJ.
  • Acceptance criteria: Presence of the correct identification number.
  • Visual inspection of edges preparation length and high/ low check for each weld.
  • Check welding material to use are in compliance with the storage conditions and the applicable WPS.
  • Acceptance Criteria: handling & storage procedure for welding consumable.
  • Check the welder & welding operators are qualified.
  • Acceptance criteria: API 1104. Welding of pipeline and related and facilities.
  • Acceptance Criteria: GS EP PLR 421, Site welding of carbon steel pipeline to API 1104.
  • Check correct WPS, consumables and welding parameter are being used for each type of weld.
  • Visual inspection of weld 100%
  • Acceptance criteria: GS EP PLR 421, Site welding of carbon steel pipeline to API 1124 (Mild intermediate and sever sour service).
  • Contractor: SUBSEA 7
  • Client: TOTAL
  • Project: Clove Project Sur

Education

Bacharel Degree - Electromechanical Engineering

Oscar Ribas- University
Luanda, Angola

Skills

  • Computer Operation: Familiarize in MS-office window

LANGUAGES

English
Portuguese

INTERESTS

I like Reading books, watching TV and move, play Football with friend and make exercise.

Timeline

Mechanical Coordinator

Spie Oil in Gas Service
2024.03 - 2026.03

Project Site Advisor

Spie Oil in Gas Service
2023.09 - 2024.03

Project Site Advisor

Spie Oil In Gas Service
2023.09 - 2024.03

Project Site Advisor

Spie Oil in Gas Service
2023.09 - 2024.03

Mechanical Supervisor

Cabgoc and Chevron
2019.04 - 2023.09

Mechanical Inspector

Cabgoc and Chevron
2017.02 - 2019.03

QC Specialist

GE (General Electric)
2014.02 - 2016.10

QA/QC- Welding Inspector

SONAMET Fabrication and Test Plan – Double joints
2011.12 - 2014.02

QC - Welding Inspector

SONAMET

QC Welding Inspector

SONAMET

Welding Inspector

SONAMET

Bacharel Degree - Electromechanical Engineering

Oscar Ribas- University
Augusto Manuel