Summary
Overview
Work history
Education
Skills
Personal Information
Certification
Confidential
Timeline
Generic

ASIM ZEB

Epsom,UK

Summary

Experienced project manager with focus on delivering complex projects within scope, time, and budget. Proven capability to lead cross-functional teams, streamline processes, and drive project success through strong communication and problem-solving skills. Adept at managing stakeholder expectations and mitigating risks to ensure project alignment with business objectives.

Overview

1
1
Certification
4
4
years of post-secondary education
14
14
years of professional experience

Work history

NEC Project Manager

Westmorland & Furness Council
Barrow In Furness, Cumbria
11.2025 - 09.2026
  • Client-side Project Manager for the £23m A595 Grizebeck Improvement Scheme delivered under NEC3 ECC. Managed Contractor, Designer and Supervisor teams throughout construction, ensuring effective programme management, technical assurance, commercial and risk management, stakeholder engagement and governance. Administered contract using CEMAR, overseeing Early Warnings, Compensation Events, Project Manager Instructions, Quotations, Applications for Payment and programme acceptance. Delivered technical oversight across highways, structures, drainage, earthworks, geotechnics and utilities, ensuring compliance with DMRB and MCHW requirements while fostering relationships with statutory undertakers, local stakeholders and multidisciplinary teams for successful project delivery.
  • (A595 Grizebeck)
  • Implemented quality control measures, ensured adherence to standards.
  • Facilitated smooth transitions between project stages for seamless progression.
  • Led cross-functional teams to achieve project goals on time.

Project Manager

HS2/MDJV
London
01.2025 - 01.2026
  • Designed new signalised junction for construction vehicle access to Euston Station site from Hampstead Road, including a haul road and site access road for major utility works. Coordinated multiple stakeholders and designers, supporting a 5m deep utility corridor beneath the haul road using digital twin within BIM environment. Collaborated with structural engineers to design retaining wall and utility protection, ensuring full compliance with HS2 policies and procedures and obtaining necessary sign off from highway authorities including TfL and LB Camden.
  • HS2 Euston (NEC3 Option A contract)
  • Fostered a positive work environment, enhanced team productivity substantially.
  • Steered teams through complex project phases to successful completion.
  • Utilised advanced project management tools for superior tracking and reporting.

Design Services Manager

Cambridgeshire County Council
Cambridge, Cambridgeshire
01.2024 - 03.2025
  • Led the County Council's in-house design team across a varied portfolio of projects as Design Services Manager. Designed and delivered schemes effectively and efficiently across a wide range of transport projects. Collaborated with teams across the organisation to design infrastructure projects, providing technical input and expertise throughout the pre-construction phase.
  • Provided leadership to Project Delivery team, ensuring effective design of projects enhancing transport infrastructure network.
  • Engaged with key partners, including CCC’s highway service provider and District Councils, to design infrastructure projects aligning with Council and partners’ objectives.
  • Actively sought input from local communities, businesses, Councillors, key stakeholders, and potential users to meet project needs and align with Council expectations throughout development.
  • Programme Management, Procurement and Delivery – Provided robust forward and integrated work programmes embedded with clarity in decision making, timelines, and control processes.
  • Monitored capital projects within portfolio, managing funding commitments under contracts valued between £0.5m and £30m. Implemented risk monitoring processes in line with corporate guidelines for each project.
  • Construction Design Management (CDM) – Responsible for communicating and checking the implementation of relevant Health & Safety regulations and how they apply to the design discipline. Lead consultation of, and make final decisions on, design choices and explain how they will impact the outcome of projects in a construction phase.

Technical Lead, Highways and Major Projects

Project Centre Ltd
London, England
09.2016 - 01.2024

Housing Infrastructure Fund – Hoo Peninsula Roads Improvement (£86M), Medway | Medway Council | Project Manager

  • Executed in-house VISSIM and LinSig modelling to facilitate design optioneering, addressing challenges identified in Strategic Modelling by FORE/Project Centre. Managed risk early, conducted detailed cost plan reviews, and coordinated programme management to optimise concurrent operations across multi-disciplinary teams. Project Centre provided EIA, highways, traffic, traffic signals, lighting, drainage and structures designs, WCHAR, EQiA and utility management in conjunction with supporting the Council’s EIA and Consultation teams.
  • Scheme included strategic modelling, VISSIM and LinSIG modelling, new grade separation junctions, upgrade of 6 major junctions/roundabouts, on-slip overbridge and significant embankment and earthworks, new relief roads for housing developments, upgrade of single lane carriageway to 2-lanes, retaining walls, new and upgrade of existing drainage infrastructure, VRS assessments and proposals, new lighting, signals and signage inc, VMS.

Lea Bridge Road – Mini Holland | Waltham Forest | NEC Project Manager (completed)

  • Designed £11M cycle improvement scheme through urban and rural landscapes. Converted Whipps Cross Roundabout into major signal controlled junction, overcoming challenges related to sensitive land boundaries, limited drainage options, and high traffic flows. Conducted early optioneering and stakeholder engagement to identify optimal solutions, aiding the timely phasing of works. Multiple clients and third-party interfacing along the route required special attention when working on the 8 different phases and rolling out the design for delivery.

HS2 Schemes – Align | Project Manager (completed)

  • Preliminary design for access, pre and post-condition surveys, structural assessments, route survey and signing, preliminary and detail designs for access routes (junction improvements, roundabouts and slip lanes).
  • Schemes included modelling, traffic assessments, new temporary access designs including earthworks and drainage, lighting and signal designs.

Stoneferry Road Corridor Improvement Scheme | Hull City Council | Project Director (completed)

  • RIBA 2 - 4 design of the £13m Stoneferry Road Corridor. The scheme was proposed to reduce congestion and enhance economic vitality by increasing network capacity in conjunction with a range of integrated improvements for pedestrians, bus users and cyclists. Key deliverables included strategic modelling (SATURN), business case, VISSIM and LinSIG modelling for the corridor, Highway design of 4 signalised roundabouts, active travel improvements, drainage, pavement, traffic signal, VMS and lighting designs.

Watford High Street & Clarendon Road | Watford Borough Council | Project Director (completed) £9m

  • Implemented public realm and traffic safety improvements to minimise motor vehicle dominance, enhance 'High Street' identity, and promote cycling and pedestrianisation.
  • Added Value / Lessons Learnt:
  • Concept to Detail design package to WBC and HCC Technical Approval
  • Lead on multi-disciplinary deliverables – Highway, drainage, signals, lighting, structures and SUDS designs
  • Consultation – preparation of consultation documents; arrangements and attendance of public and stakeholder meetings.
  • Project Support – Project management duties; meetings; proactive monitoring and management of project expenditure and evolving construction cost estimates; Liaison with WBC/HCC and production of information/ analysis required to fulfil funding requirements
  • Site Support – Early consideration and advice on traffic management co-ordination; Project Manager (NEC Contract); QS services (managing CEs, EWs, CE Register and costings)
  • TMO Support – preparing TMO documents, distributing TMO letters, erecting street notices; advertising TMOs; updating park map.

Vauxhall Way Corridor Improvements | Luton Borough Council | Project Director (completed)

  • A Vissim model was developed to support the review considering committed development, background traffic growth and increasing demands at Luton Airport. Study extents focused on Vauxhall Way as a key north – south corridor for through traffic. Modelling recommended a series of junction mitigation measures, focusing on prioritising future sustainable modes of transport, including bus priority.
  • To increase entry and exit lane capacity, modelling indicated the requirement to widen Vauxhall Way facilitating inclusion of a dual carriageway. Modelling identified Vauxhall Way would be sensitive to gridlock if it remained as a single carriageway. Doubling the 2.8km route reduced delays and ensured that traffic avoided re-routing through the low-capacity and sensitive residential roads.
  • Scheme included:
  • Conversion of the roundabout at the junction of Airport Way/Vauxhall Way to a traffic signalised crossroads
  • Carriageway widening to provide dual carriageway and segregated cycle facilities adjacent to the route
  • Removal of footbridge and introduction of new footbridge at the junction with Eaton Green Road/Harrowden Road roundabout
  • Removal of footbridge over link and provision of at grade Toucan crossing
  • Conversion of the roundabout at the junction of Crawley Green Road/Vauxhall Way to a traffic signalised crossroads; and removal of pedestrian subway with provision of at grade crossing facilities
  • Conversion of the roundabout at the junction of Stopsley/Hitchen Road/Vauxhall Way to signalised crossroads and
  • Retaining wall designs
  • Landscaping, SUDs and VRS designs
  • Site Investigations and surveys - CCTV Drainage survey, Coring and Trial holes, Noise and Air Assessment, Topographical and GPR stats surveys, Ground Investigations including Infiltration tests and CBR, Ecology Survey, Tree Surveys, FRA, Land Ownership, EIA, EQiA and WCHAR

Principal Consultant, Highways and Transportation

EnterpriseMouchel
London
03.2013 - 03.2016

Design Manager Responsibilities

  • Led and supported multidisciplinary design teams, creating a positive and productive working environment.
  • Mentored junior engineers and technicians, helping develop their technical knowledge and confidence.
  • Improved delivery efficiency by streamlining design management, programme and review processes.
  • Built strong relationships with clients, stakeholders and internal teams through clear and proactive communication.

Technical Delivery

  • Delivered feasibility, preliminary and detailed design for TfL highway maintenance and improvement schemes under the LoHAC South Area contract.
  • Line managed senior engineers, engineers, graduates and CAD technicians, providing coaching, mentoring and technical support.
  • Designed and managed carriageway, footway, VRS, active travel and public realm schemes from inception through to site implementation.
  • Prepared feasibility options, traffic modelling inputs, highway alignments, drainage solutions, traffic management plans, signs, road markings and contract documentation.
  • Coordinated multidisciplinary inputs, including drainage, pavement, structures, road safety, street lighting and traffic signals, to produce complete design packages for clients.
  • Managed surveys and investigations, including traffic surveys, pavement/drainage investigations, site inspections, data collection and construction supervision.
  • Prepared and reviewed specifications, drawings, calculations, Designer Risk Assessments, project checklists and contract documents.
  • Supported Traffic Regulation Orders, temporary traffic management arrangements and NRSWA notice reviews.
  • Organised and responded to Road Safety Audits and ensured CDM and health and safety requirements were embedded throughout design and delivery.
  • Led client, stakeholder, statutory undertaker and project sponsor engagement, including meetings, progress reporting and agreement of briefs, proposals and deliverables.
  • Advised on project priorities, programmes, expenditure monitoring, Local Plans, Development Briefs and wider highway/traffic management strategies.

Education

MSc. - Engineering Business Management

University of Warwick
01.2002 - 01.2003

BEng. - Civil Engineering

National University of Sciences And Technology
Pakistan
01.1999 - 01.2002

Skills

Project and Programme Management

  • Project and programme management for complex public-sector highways, transport, public realm and regeneration schemes
  • Programme planning, monitoring and reporting, including MS Project and integrated delivery programmes
  • Risk, issue, dependency and financial management across design and construction stages

Design Management and Technical Assurance

  • Multidisciplinary design management across highways, drainage, structures, traffic engineering, street lighting and traffic signals
  • Coordination of integrated design packages from feasibility through to detailed design, approvals and construction support
  • Technical assurance of designs against DMRB, MCHW, SHW, CDM Regulations and relevant British Standards
  • Infrastructure design and technical assurance for Section 278 and Section 38 adoption schemes

Commercial and Contract Management

  • NEC contract management, administration and delivery, including Early Warnings, Compensation Events, programme review and contractor management
  • Procurement, contract management and commercial oversight of major construction and professional services contracts
  • Financial control, budget monitoring, cost forecasting and value-for-money assessment

Business Case, Strategy and Investment

  • Business case development, options appraisal and investment planning for public-sector infrastructure schemes
  • Development of delivery strategies and investment-led programmes aligned with council objectives and funding requirements
  • Experience supporting funding submissions, cost estimates and benefit-led decision making

Active Travel, Sustainability and Regeneration

  • Active travel and public realm design expertise, including walking, cycling, accessibility, SuDS, landscaping and low-carbon transport improvements
  • Regeneration and place-making design experience for town centre, corridor improvement and public realm schemes
  • Sustainable transport design focused on improving accessibility, safety, connectivity and local economic vitality

Stakeholder and Statutory Processes

  • Stakeholder engagement with local authorities, elected members, statutory undertakers, consultants, contractors and community stakeholders
  • Traffic management planning, construction phasing, NRSWA coordination and Traffic Regulation Order support
  • Principal Designer experience, including design risk management, health and safety coordination and CDM compliance

Software Proficiency

Proficient in AutoCAD, Civil 3D, CEMAR for NEC contract administration, MS Project for programme planning and monitoring, and Microsoft Office applications, including Excel, Word, PowerPoint and Outlook

Personal Information

Nationality: British

Certification

MCIHT, NEC 3 and 4 Accredited Project Manager, CEEQUAL/BREEAM Infrastructure Assessor

Confidential

Confidential

Timeline

NEC Project Manager

Westmorland & Furness Council
11.2025 - 09.2026

Project Manager

HS2/MDJV
01.2025 - 01.2026

Design Services Manager

Cambridgeshire County Council
01.2024 - 03.2025

Technical Lead, Highways and Major Projects

Project Centre Ltd
09.2016 - 01.2024

Principal Consultant, Highways and Transportation

EnterpriseMouchel
03.2013 - 03.2016

MSc. - Engineering Business Management

University of Warwick
01.2002 - 01.2003

BEng. - Civil Engineering

National University of Sciences And Technology
01.1999 - 01.2002
ASIM ZEB