Summary
Overview
Work history
Education
Skills
Interests
Timeline
Generic
Ashish Chauhan

Ashish Chauhan

Sutton in Ashfield,India

Summary

SYNOPSIS A technocrat with over 8+ years of Global experience in Project Implementation and Quality assurance. Demonstrated communication and relationship management skills with the ability to lead and work in cross-functional teams in a cross-cultural environment. Team leader with excellent written communication and inter personal problem solving skills. Good experience of working with Telecom Fiber, transmission equipment's and in depth understanding of the protocols. Good experience of working with FTTH: OLT, ONU, ONT, Splitter. Good experience as a Fiber splicer, OTDR handling and tracking fiber losses. Good experience of working with Power distribution project.

Overview

16
16
years of professional experience
4
4
years of post-secondary education

Work history

Slicing and testing engineer

Sterlite technologies limited
Sutton in Ashfield, Nottinghamshire
01.2022 - Current

AIRBAND EXETER :-

  • Responsible for CBT installation overhead and UG .
  • Splicing Node small , medium to connect CBT .
  • Testing the CBT with required Power level .
  • Fault detection and clearing the fault with OTDR and VFL .
  • Splicing Large joints from Exchange .


Fibre and wireless :-

  • Responsible for splicing Node .
  • Splicing for tapping of feed fiber .
  • OTDR tracing and fault detection .
  • splicing and testing of FAT boxes .


Netomania North :-

  • Responsible for splicing L3 , L2 , L1 , L0 Nodes .
  • splicing and testing of CBT .
  • OTDR tracing and fault detection .
  • Test rodding and roping for UG sections .
  • Overhead cabling for CBT spans and Feed cable .
  • Mark A55 for blockages found .




B. TECH, Himachal Pradesh university
01.2008 - 01.2012
  • National power training institute (Post graduation)

Fiber Splicer Freelancer

ORGANISATIONAL DETAILS
CHANDIGARH
08.2019 - 11.2021
  • Projects Major working Fields - Telecom FTTX (FTTH), FTTC, Fiber aerial, underground project implementation and splicing work for fiber joints
  • TI works (900,2100, LTE upgrade, Multisector installation and supervision), MW links, PTN installation and commissioning
  • Conceptualizing the technical requirements of new projects
  • Studying, analyzing & determining methodology of the implementation of projects
  • Generate the project requirements, project specification and functional specification documents Analyzing and define testing methodology
  • Achieving monthly targets for roll outs and network availability, Presently working: Fiber optics -OSP FTTH, FTTB
  • Designation: Splicer
  • Machine: Fujikura 88S, Sumitomo Z1C
  • Customer: Airtel Fiber , Jio Fiber Analyzing the splicing plan issued and fiber tree distribution
  • Responsible for Fiber splicing straight joints 48F,96F
  • Preparing the cable with help of axle cut or normal cut
  • Tapping to be given in enclosure to FAT box as per splicing plan
  • FAT (Fiber access terminal), OTB (optical termination box) and DP (Distribution point) installation and splicing as per plan
  • Pigtails to be spliced and patching done with secondary splitter at FAT box and sub pillar
  • Responsible for Labelling work at FAT box and pillar Responsible for fault location with help of OTDR, LSPM and Laser source
  • Responsible for installation of enclosure with proper sealing
  • Conducting flash test on fiber enclosure
  • ODF, Pillar splicing with pigtails and patching with primary splitter
  • Installation of S1 splitter in enclosure
  • Responsible for FDP termination at OLT for 48 F cable
  • Responsible for installation of FMS, Tapping for FAT boxes
  • Underground and overhead cable fiber works for FTTH.

Telecommunications engineer

ZFT Myanmar Ltd, Zhong Futong Company
MYANMAR, YANGON
03.2016 - 08.2019
  • Customer : Ericson ,Mytel GPON , Oredoo , Telenor
  • Installing and commissioning of Ericson , ZTE RF network equipment's .
  • Ericson site installation , commissioning and on air the site .
  • Work Exposure: - Responsible for optical fiber cable laying overhead and underground for Mytel customer GPON project
  • Cable termination at wireless tower installation and splicing of FDP
  • Straight joints for cable
  • Tapping of fiber cable done as per plan given
  • Responsible for fault location with help of OTDR, LSPM and Laser source
  • Responsible for installation of enclosure with proper sealing
  • Conducting flash test on fiber enclosure
  • ODF, Pillar splicing with pigtails and patching with primary splitter
  • Installation of S1 splitter in enclosure
  • Responsible for FDP termination at OLT for 48 F cable
  • Responsible for all the Managing the TI teams for all kind of sites (RF+MW) (GSM, U2100, 1800 LTE, L900
  • MW links and Fiber PTN link
  • Prepare all date and MIS for Sites
  • Prepare all invoices and handles the cash flow sheet of project
  • Responsible for team management, planning, customer, handling Responsible for all activity in field
  • To Provides technical supports to engineers & technicians active & passive issues
  • To provide best service to customers along with engineers for complaint issues.

Sr. Telecom Engineer and Regional lead

Zamil Tele infra-Myanmar Ltd
04.2014 - 03.2016
  • For Telecom civil project
  • Customer: Ooredoo Myanmar, Telenor Project & MPT project, ZTE, IGT Telecom projects
  • Work Exposure: -
  • Complete installation and commissioning RTN, BBU, PTN, NEC IDU, ZTE IDU
  • Responsible for acceptance test
  • Responsible for PM activity
  • Responsible for civil and electrical installations
  • Responsible for Site layout, excavation, PCC, RCC and other site construction activities
  • Responsible for CIP, Template setting with zero error
  • Responsible for the tower erection with passing the tests like -Verticality, Tension of the guy wire and torque of every nut
  • Responsible for DG, BTS Cable tray construction, grounding and bus bar installation
  • Responsible for timely meet of RFI targets
  • Responsible for DG installation, Battery bank installation, power manager and other power related installations on the site
  • Responsible for maintaining all the site data and signing of all financial milestones timely
  • Responsible for sites PAT, FAT and site handover
  • Responsible for the good customer relationship and providing them all the data on timely basis

Site Engineer

GNG group Pvt. Ltd
10.2012 - 04.2014
  • Delhi NCR location
  • Customer: Dakshin Haryana Bijli vitran nigam , MCF ,MPKVVCL
  • Work Exposure: - Worked as site engineer for supply, erection, testing & commissioning of 11 KV independent feeder for Municipal cooperation Faridabad under surveillance of DHBVN (Dakshin Haryana Bijli vitran nizam)
  • Also the Liaoning work was accomplished under this project like load sanction from (XEN,SE,CE ) , Demand notice for a feeder, BOQ ,Estimate ,CEI (chief electrical inspection) , VCB sanction for particular feeder from particular sub-station
  • This project was accomplished while working under GNG power Pvt
  • Ltd
  • Worked as site engineer for GPS survey of various feeder's 11 KV under Feeder separation program of RGGVY (Rajiv Gandhi Vidyut Karan pariyogna) project in various parts of Vidisha (MP) district
  • This project was being tendered by REC to GNG power
  • This project was accomplished while working under GNG power Pvt
  • Ltd

Education

A-Levels - Electrical engineering

Bachelor in engineering
01.2008 - 01.2012

Skills

Ceritifications :-


SA001

SA002

N027

N028

IPAF

NRSWA

S9

S8

Interests

Hobby : , Travelling, Reading, Music, collecting coins.

Timeline

Slicing and testing engineer

Sterlite technologies limited
01.2022 - Current

Fiber Splicer Freelancer

ORGANISATIONAL DETAILS
08.2019 - 11.2021

Telecommunications engineer

ZFT Myanmar Ltd, Zhong Futong Company
03.2016 - 08.2019

Sr. Telecom Engineer and Regional lead

Zamil Tele infra-Myanmar Ltd
04.2014 - 03.2016

Site Engineer

GNG group Pvt. Ltd
10.2012 - 04.2014

A-Levels - Electrical engineering

Bachelor in engineering
01.2008 - 01.2012

B. TECH, Himachal Pradesh university
01.2008 - 01.2012
Ashish Chauhan