Over the years, I have worked on a wide range metal and plastic ducting for MVHR systems in new builds and existing properties.
1st Fix Work- Installing ductwork, running ventilation routes, cutting and fitting ducts, and ensuring airtight connections before walls/ceilings are closed up.
2nd Fix Work – Fitting terminals, grilles, silencers, and final connections to the MVHR unit, ensuring correct airflow balance.
Alteration Works– Adjusting or modifying existing ductwork, rerouting, or upgrading systems as required.
1st Fix: Installing and routing ductwork, ensuring airtight connections, and preparing systems before finishing works
2nd Fix: Fitting terminals, grilles, silencers, and making final unit connections
Alteration Works: Modifying and upgrading duct systems in existing buildings
Commissioning: Testing and balancing airflows, ensuring systems operate efficiently and meet design specifications
Key Skills:
Installation of MVHR ducting (metal & plastic)
New build and retrofit projects
System alterations and upgrades
Commissioning & performance testing
Reading and working from technical drawings
Health & safety compliance on site