Summary
Overview
Work History
Education
Skills
Certification
Work Availability
Software
Timeline
Ahmed Warda

Ahmed Warda

Solihull

Summary

Ambitious Planning and project control Manager with 14 years leading organizational planning functions in support of overall business strategy and goal achievement. Knowledgeable industry veteran with background analyzing report data, controlling inventory and forecasting. Innovative with history crafting new strategies for planning process and tactics to boost sales.

Overview

14
14
years of professional experience
2
2
Certification
2
2
Languages

Work History

Planning Manager

VINCI Construction Grand Projects
10.2021 - Current
  • Lead planning and project control department for tunnel sublot.
  • Prepare ,manage and update project Cl.31 and Cl.32 Programme according to NEC contract requirements
  • Assess impact of changes to project scope or requirements on project plans and schedules, and implement adjustments as needed.
  • Load resource, manpower and cost to programme
  • Prepare Procurement and Engineering schedule along with regular tracker
  • Coordinate between sub-contractors for their interfaces and programme update
  • Prepare EOT and Delay analysis and review subcontractors claims
  • Manage and follow up design programme and deliverables in coordination with design managers and director
  • Manage, coordinate and plan development of planning team .

Senior Planning Engineer

Besix
05.2018 - 10.2021
  • Guggenheim Museum Abudhabi
  • PMC: Turner
  • Project budget: 4 billion Dirhams
  • Project: Improvements of Al Shindagha Corridor – Main Crossing Bridge
  • Consultant: Parsons
  • Project budget: 400 Million Dirhams
  • Prepare project Baseline
  • Implement lean Planning [ Last Planner system] in collaboration with site team and subcontractors
  • Load resource, manpower and cost to programme
  • Prepare Procurement and Engineering schedule along with weekly tracker
  • Utilize Earned Value Management (EVM) for Progress Tracking /Monitoring
  • Coordinate between sub-contractors for their interfaces and programme update
  • Issue Monthly and Weekly reports
  • Prepare EOT and Delay analysis and review subcontractors claims
  • Represent Planning department in different meetings with Client, Consultant and Subcontractors.

Senior Planning Engineer

Besix, Abu Dhabi
12.2016 - 04.2018
  • Masdar Institute Neighbourhood – Design and Build EPC Contract
  • PMC: Hill international
  • Project budget: 1.04 Billion Dirhams
  • Prepare project Baseline
  • Prepare resource dictionary and high scope productivity rates
  • Load resource , manpower and cost to programme
  • Prepare monthly payment as per the programme progress update
  • Prepare Procurement and Engineering schedule along with weekly tracker
  • Utilize Earned Value Management (EVM) for Progress Tracking /Monitoring
  • Develop design and construction KPI’s for the progress Monitoring
  • Coordinate between sub-consultants and sub-contractors for their interfaces and programme update
  • Prepare EOT , Review and assess subcontractors Delay analysis and EOT Requests

Planning Engineer

Besix
01.2016 - 11.2016
  • Project: Dubai water Canal Project: Bluewaters pedestrian bridge
  • Consultant: Ch2m-Halcrow Consultant: Mirage
  • Project budget: 1.2 Billion Dirhams Project budget: 65 Million Dirhams
  • Prepare of the detailed and resource loaded project schedule, with all periodic updates and reports
  • Internally and Externally
  • Prepare of a weekly construction targets and evaluation of site progress
  • Implement and Integrate productivity system with project Schedule to improve process efficiency and reduce
  • The project duration and cost
  • Monitor and track progress and delays to advise the required mitigation actions to site and management team
  • Prepare contract time claims and delay analysis in addition to any required support in variations preparation Process.

Planning Engineer

Mohamed Ali Alswailm Group, MASCO
04.2015 - 12.2015
  • Project: Leak and Corrosion Detection Systems for Pipelines Project: Alkhobar and Ihssa Infrastructure
  • Client: Saudi Aramco PMC: Parsons
  • Project budget: 1.2 Billion Dirhams Project budget: 280 Million Saudi Riyals
  • Prepare and update the fully resource loaded project schedule in coordination with the specialist subcontractors
  • Review and update the project cash flow, shop drawings and materials schedules and logs
  • Prepare Monthly and Weekly reports and Dashboards
  • Prepare time impact analysis for claims
  • Collaborate with other departments including Cost Control/Procurement/Construction/Quantity Survey and
  • Contracts to assure the project management integrity in the project.

Planning and cost control Engineer

Gama for Trading and Contracting
01.2013 - 03.2015
  • Project: Porto Matrouh Buildings & Hotel Project: Edita Factory Polaris Park
  • PMC: Moharamm Bakhom ACE PMC: Cosmos
  • Project budget: 163 Million EGP Project budget: 70 Million EGP
  • Project: Badr 500KV GIS Substation Project: Hanger 7000 Development In Cairo Airport
  • Client: Alstom PMC: Parsons
  • Project budget: 40 Million EGP Project budget: 280 Million Saudi Riyals
  • Preparing Schedule Baseline loaded By Roles &Resources
  • Ensure application of progress and follow up control forms, recommending mitigation actions to the project team
  • Prepare contract time claims and delay analysis
  • Track & Control Cost Of Labour, Material, Equipment & Subcontractors to issue Cost control report
  • Highlighting the key performance indicators time and cost wise
  • Follow up on variations process and updating the project Budget accordingly

Technical office Engineer

El Rowad Group for Construction
03.2012 - 01.2013
  • Update Schedule and Prepare weekly and Monthly Progress Report
  • Develop Recourses Histogram and Progress S-Curve
  • Develop Revised and Recovery Programs
  • Revision of Quantities After Construction & Preparing Invoices
  • Help in Preparing Procurement plan for material and Manpower

Planning Engineer

Link International
08.2010 - 01.2011

Education

BSC of Engineering - Civil Engineering

Faculty of Engineering-Zagazig University, Egypt
2010

Skills

  • Primavera P6
  • Synchro
  • TILOS
  • Power BI
  • Delay Analysis and claims
  • Revit Structure
  • AutoCAD
  • SAP
  • CSI Diploma ( Sap – Safe – CSI Col)
  • AutoCAD Structural Detailing
  • Team Leadership & Development
  • Cross-Functional Collaboration
  • Department Oversight

Certification

PMP

ACIARB

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Software

Primavera P6

Synchro

Tilos

Power BI

CEMAR

Microsoft office

MS Project

Timeline

Planning Manager - VINCI Construction Grand Projects
10.2021 - Current
Senior Planning Engineer - Besix
05.2018 - 10.2021
Senior Planning Engineer - Besix, Abu Dhabi
12.2016 - 04.2018
Planning Engineer - Besix
01.2016 - 11.2016
Planning Engineer - Mohamed Ali Alswailm Group, MASCO
04.2015 - 12.2015
Planning and cost control Engineer - Gama for Trading and Contracting
01.2013 - 03.2015
Technical office Engineer - El Rowad Group for Construction
03.2012 - 01.2013
Planning Engineer - Link International
08.2010 - 01.2011
Faculty of Engineering-Zagazig University - BSC of Engineering, Civil Engineering
Ahmed Warda