I am a highly self-motivated engineer and leader with an absolute ambition to constantly learn, improve and succeed, with direct experience in delivering results-orientated, world class solutions. Team coaching, development and leadership skills are utilised to deliver business KPI's and execute projects with effective engineering strengths that are both creative, logical and always solutions focused. I have very strong organisational and financial management abilities with a proven track record in delivering complex programs to scope, on time, within budget, and without compromise to quality. With experience in management of multi-disciplined engineering functions to deploy for creation, continuous improvement and maintenance purposes.
My knowledge and delivery has shown that the P&L is positively impacted by delivering exceptional engineering solutions and by efficiently impacting the bottom line through TPM, Continuous Improvement, Supply Excellence, allied partnerships, engineering governance and compliance, and sharing best-practices globally.
Reporting into SVP, responsible for strategic planning of Global Supply Chain for Health business, leadership of Capex investment program and special projects
Responsible for master planning and long term strategy of VMS and Health products with specific focus on in-sourcing products from Co-packers:
Responsible for the departments operational and tactical management of multi-disciplined Engineers to deliver NPD and EPD projects to meet company objectives, for Nurofen, Mucinex, Airborne, Move Free and Megared brands:
Responsibility of a large manufacturing plant of all in-direct equipment, building, Sanitation and Security. Developed Facilities team skills to ensure the execution of a Healthcare site requirements are met:
Primary responsibilities included inception to completion management and engineering of Capital Projects which include the specification, design, equipment trials and acceptance, installation, commissioning and validation of equipment and process utilities to meet future capacity growth and to introduce more efficient methods of manufacturing and support.
Successfully led a cross functional team to deliver a highly complex project to in-source products from co-packer:
Designed, installed and validated a world class Purified Water system from base:
Liquids Capacity: Led and supported multi-faceted project to deliver additional Nurofen for Children and Mucinex capacity for two new packaging lines. The project included:
Purified Water: upgraded existing Purified Water system to include modernized Reverse Osmosis and CEDI system to meet latest company standards and USP/EP requirements.
Symex 5000: Responsible for a delivering a high-volume lotions manufacturing plant from inception to completion with calculated savings of >£1,400,000 pa.
Purified Water: Led and assisted in various aspects of the design and construction a modern Purified Water system; including dual Ion exchange generation, 20,000L storage vessel with 3” distribution and 2” ring-mains to deliver auto-dispensed PW to 25 points of use.
Symex Advanced Crèmes: This process suite was designed to be the most advanced crèmes process plants in ELC using improved technologies and innovations including an automated CIP system with steam SIP. This attributed to a 50% reduction in CIP cycle times and resulted in 13% reduction in total processing time.
Sychem Rack Washer: Machine to hygienically clean and dry raw material buckets, containers and utensils. The project included full process flow analysis and the complete upgrade of the washroom facility. Throughput increased by 150% from the previous methods.
Bottle Filler CIP: Designed and implemented a CIP system to reduce change over times by 58%.
Pre-weigh Down-flow booth: Eliminated an identified bottle neck in the overall value stream by implementing a Kanban system and arranging the flow of materials more efficiently. The total output of raw material picking increased by 20%.
eXP Purified Water Auto-batching: Designed and implemented extension to ring-main and include a new auto-dispensing system with batching accuracy
Project Management
undefinedMicrosoft Project
AutoCAD
Microsoft Excel (Advanced)
Trackwise; Change Control, Deviation and Risk Management
Minitab
SAP
Monday
I love outdoor activities particularly skiing, hiking and anything that involves a good adventure Exploring the world is a passion and I have been lucky enough to backpack around Sri Lanka, Central America and the Himalayas